{"title":"MONITORING OF PILE FOUNDATION ENGINEERING IN DENSE URBAN DEVELOPMENT CONDITIONS ON LANDSLIDE HAZARDOUS SITE","authors":"N. Marienkov, K. Babik, Y. Bolotov, V. Dunin","doi":"10.3997/2214-4609.201903178","DOIUrl":null,"url":null,"abstract":"Summary An example of the application of modern regulatory requirements for the scientific and technical support of construction and monitoring of building structures for the safe arrangement of the pile foundation on a landslide hazardous building site in conditions of dense urban development in Kyiv during the installation of a O820 mm bored pile according to the plan of the pile field has been considered. Continuous monitoring of the pile installation process was conducted for more than 6 hours. Experimentally registered levels of vibration acceleration on the foundation wall of the building in the vertical and horizontal directions do not exceed 0,015 m/s2, which is significantly lower than the minimum permissible values of vibration acceleration for the foundations of buildings with brick bearing walls 0,15 m/s2. The research also evaluated the presence of visible damage to the building in the available places and their possible development before and after piles placement. The condition of the plaster screed on a vertical crack in the wall of the house on the 8th floor, which was installed before the start of construction work, after pile foundation installation has not changed - it remained undamaged.","PeriodicalId":263790,"journal":{"name":"Monitoring 2019","volume":"155 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Monitoring 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3997/2214-4609.201903178","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Summary An example of the application of modern regulatory requirements for the scientific and technical support of construction and monitoring of building structures for the safe arrangement of the pile foundation on a landslide hazardous building site in conditions of dense urban development in Kyiv during the installation of a O820 mm bored pile according to the plan of the pile field has been considered. Continuous monitoring of the pile installation process was conducted for more than 6 hours. Experimentally registered levels of vibration acceleration on the foundation wall of the building in the vertical and horizontal directions do not exceed 0,015 m/s2, which is significantly lower than the minimum permissible values of vibration acceleration for the foundations of buildings with brick bearing walls 0,15 m/s2. The research also evaluated the presence of visible damage to the building in the available places and their possible development before and after piles placement. The condition of the plaster screed on a vertical crack in the wall of the house on the 8th floor, which was installed before the start of construction work, after pile foundation installation has not changed - it remained undamaged.
滑坡危险场地密集城市发展条件下桩基工程监测
以基辅密集城市发展条件下滑坡危险建筑场地为例,根据桩场规划安装O820 mm钻孔灌注桩,应用现代法规要求对建筑结构进行施工科技保障和监测,对桩基进行安全布置。对桩身过程进行连续监测6小时以上。实验记录的建筑物基础墙在垂直和水平方向上的振动加速度水平不超过0,015 m/s2,这明显低于砖承重墙建筑物基础的最小振动加速度允许值0,15 m/s2。该研究还评估了在可用的地方对建筑物的可见损害的存在以及它们在打桩前后的可能发展。在施工开始前安装的8楼房屋墙体垂直裂缝处的灰泥找平片,在桩基安装后没有发生变化,没有损坏。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书