Electric dreams [micro-hydroelectric plant]

Power Engineer Pub Date : 2006-06-01 DOI:10.1049/PE:20060307
J. Woodward
{"title":"Electric dreams [micro-hydroelectric plant]","authors":"J. Woodward","doi":"10.1049/PE:20060307","DOIUrl":null,"url":null,"abstract":"This paper discusses the story behind the successful electrification of Faseau, a remote village in Papua New Guinea. Unlike power supplies in other remote villages in the country, Faseau's installation relied entirely on voluntary labor, being funded by overseas aid donors and the community itself. While the technical features of the 7 kW micro-hydroelectric power plant project are not sophisticated, they are robust and were chosen to meet project requirements such as economy, ease of transport, installation and operation. Because the range of skills available in the village is diverse and there was no process during construction that could not be handled by local people after an initial demonstration, concerns about the sustainability of the electricity network are easily allayed.","PeriodicalId":182274,"journal":{"name":"Power Engineer","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Power Engineer","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1049/PE:20060307","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This paper discusses the story behind the successful electrification of Faseau, a remote village in Papua New Guinea. Unlike power supplies in other remote villages in the country, Faseau's installation relied entirely on voluntary labor, being funded by overseas aid donors and the community itself. While the technical features of the 7 kW micro-hydroelectric power plant project are not sophisticated, they are robust and were chosen to meet project requirements such as economy, ease of transport, installation and operation. Because the range of skills available in the village is diverse and there was no process during construction that could not be handled by local people after an initial demonstration, concerns about the sustainability of the electricity network are easily allayed.
电之梦[微型水力发电厂]
本文讨论了巴布亚新几内亚一个偏远村庄法索成功电气化背后的故事。与该国其他偏远村庄的电力供应不同,法索的安装完全依靠志愿劳动,由海外援助捐助者和社区本身提供资金。虽然7千瓦微型水力发电厂项目的技术特点并不复杂,但它们是坚固的,并且选择满足经济,运输方便,安装和运行等项目要求。由于村里可用的技能范围是多种多样的,并且在最初的示范之后,在建设过程中没有任何过程不能由当地人处理,因此对电网可持续性的担忧很容易缓解。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信