Mt. Olympus Cove Environmental Geology Study: An Alluvial Fan Case History

Utah Geology Pub Date : 1900-01-01 DOI:10.34191/ug-1-1_21
B. Kaliser
{"title":"Mt. Olympus Cove Environmental Geology Study: An Alluvial Fan Case History","authors":"B. Kaliser","doi":"10.34191/ug-1-1_21","DOIUrl":null,"url":null,"abstract":"This environmental geology study of the Mt. Olympus Cove area is largely the result of concerns of Salt Lake County as expressed by the chairman of the County Commission and reiterated by the County Planning Commission, County Intergovernmental Relations Office, and the County Offices of Planning and Zoning, Surveyor, BUilding Inspection, and Flood Control. These concerns were shared by an ad hoc body constituted by the County Office of Intergovernmental Relations and consisting of technical representatives from the various county offices, Utah Geological and Mineral Survey, Utah Division of Forestry, Utah State Water Laboratory, U. S. Forest Service, U. S. Soil Conservation Service, and the U. S. Army Corps of Engineers. Meetings of the ad hoc committee led to the awarding of two contracts: the Utah Geological and Mineral Survey was to study all aspects of the terrain that might have some bearing upon the future course of development of the study area, and the Utah State Water Laboratory was to evaluate the surface water hydrology of the study area. The two contractors were charged with acquiring all available data before development of original information relevant to their responsibilities. It was intended that the report of each contractor should complement the report of the other for the purpose of establishing an overall development plan for the Mt. Olympus Cove area.","PeriodicalId":398645,"journal":{"name":"Utah Geology","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Utah Geology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34191/ug-1-1_21","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

This environmental geology study of the Mt. Olympus Cove area is largely the result of concerns of Salt Lake County as expressed by the chairman of the County Commission and reiterated by the County Planning Commission, County Intergovernmental Relations Office, and the County Offices of Planning and Zoning, Surveyor, BUilding Inspection, and Flood Control. These concerns were shared by an ad hoc body constituted by the County Office of Intergovernmental Relations and consisting of technical representatives from the various county offices, Utah Geological and Mineral Survey, Utah Division of Forestry, Utah State Water Laboratory, U. S. Forest Service, U. S. Soil Conservation Service, and the U. S. Army Corps of Engineers. Meetings of the ad hoc committee led to the awarding of two contracts: the Utah Geological and Mineral Survey was to study all aspects of the terrain that might have some bearing upon the future course of development of the study area, and the Utah State Water Laboratory was to evaluate the surface water hydrology of the study area. The two contractors were charged with acquiring all available data before development of original information relevant to their responsibilities. It was intended that the report of each contractor should complement the report of the other for the purpose of establishing an overall development plan for the Mt. Olympus Cove area.
奥林匹斯山湾环境地质研究:一个冲积扇案例历史
这项对奥林匹斯山湾地区的环境地质研究主要是盐湖县委员会主席表达的关注的结果,并由县规划委员会、县政府间关系办公室、县规划和分区办公室、测量师、建筑检查和洪水控制办公室重申。这些问题由政府间关系县办公室组成的一个特设机构分享,该机构由来自各个县办事处、犹他州地质和矿物调查局、犹他州林业部、犹他州州立水实验室、美国森林局、美国土壤保持局和美国陆军工程兵团的技术代表组成。特设委员会的会议导致了两份合同的签订:犹他州地质和矿物调查局将研究地形的所有方面,这些方面可能对研究地区未来的发展进程有一些影响;犹他州州立水实验室将评价研究地区的地表水水文。这两名承包商负责在编制与其职责有关的原始资料之前获取所有现有数据。每个承包商的报告应补充另一个承包商的报告,以便为奥林匹斯山湾地区制定一项全面的发展计划。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信