{"title":"An assessment of stakeholder participation in monitoring and evaluation of district assembly projects and programmes in the Savelugu-Nanton Municipality Assembly, Ghana","authors":"M. Sulemana, A. Musah, Kanlisi Kaba Simon","doi":"10.4314/GJDS.V15I1.9","DOIUrl":null,"url":null,"abstract":"Participatory Monitoring and Evaluation (PM&E) of projects and programmes promotes greater transparency and accountability in development governance. Some studies revealed that participation in Metropolitan, Municipal and District Assemblies in monitoring and evaluation (M&E) is low. This study adopted a case study approach. A sample of 196 people participated in the study. The study revealed that stakeholder participation in M&E of projects and programmes was high among the Municipal Planning and Co-ordinating Unit (MPCU) members and the District Assembly members but low at the Zonal Council and community levels. This has impacted negatively on the transparency, accountability and the sustenance of projects and programmes. The study concludes that stakeholders were rarely involved in M&E of projects and programmes due to lack of concerted effort by the MPCU for grass root stakeholder participation and poor attitude on the part of community level stakeholders in M&E of projects and programmes. The MPCU and the Assembly members’ involvement were appreciably high whereas the Unit committee, the community and the Zonal councils’ involvement were low. The study recommends that the District Assembly through the MPCU should establish strategies  such as increased engagement of the substructures in the planning, implementation, monitoring and evaluation process, creating an enabling environment for the substructures to set their own targets, support them to meet the targets and build their capacities to report regularly to communities under them and to the Municipal Assembly. The Municipal Assembly should partner with the Sub-structures to embark on community sensitization on participatory monitoring and evaluation of projects and programmes. Keywords: Participatory Monitoring and Evaluation, Stakeholders, Community Participation, Projects, Programmes, Savelugu-Nanton","PeriodicalId":110495,"journal":{"name":"Ghana Journal of Development Studies","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"17","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ghana Journal of Development Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4314/GJDS.V15I1.9","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 17

Abstract

Participatory Monitoring and Evaluation (PM&E) of projects and programmes promotes greater transparency and accountability in development governance. Some studies revealed that participation in Metropolitan, Municipal and District Assemblies in monitoring and evaluation (M&E) is low. This study adopted a case study approach. A sample of 196 people participated in the study. The study revealed that stakeholder participation in M&E of projects and programmes was high among the Municipal Planning and Co-ordinating Unit (MPCU) members and the District Assembly members but low at the Zonal Council and community levels. This has impacted negatively on the transparency, accountability and the sustenance of projects and programmes. The study concludes that stakeholders were rarely involved in M&E of projects and programmes due to lack of concerted effort by the MPCU for grass root stakeholder participation and poor attitude on the part of community level stakeholders in M&E of projects and programmes. The MPCU and the Assembly members’ involvement were appreciably high whereas the Unit committee, the community and the Zonal councils’ involvement were low. The study recommends that the District Assembly through the MPCU should establish strategies  such as increased engagement of the substructures in the planning, implementation, monitoring and evaluation process, creating an enabling environment for the substructures to set their own targets, support them to meet the targets and build their capacities to report regularly to communities under them and to the Municipal Assembly. The Municipal Assembly should partner with the Sub-structures to embark on community sensitization on participatory monitoring and evaluation of projects and programmes. Keywords: Participatory Monitoring and Evaluation, Stakeholders, Community Participation, Projects, Programmes, Savelugu-Nanton
对加纳萨韦卢-南通市议会地区议会项目和方案监测和评价中利益攸关方参与情况的评估
项目和规划的参与式监测和评价(PM&E)促进了发展治理的透明度和问责制。一些研究表明,市、市和区议会参与监测和评价的程度很低。本研究采用个案研究法。196人参与了这项研究。该研究显示,在市政规划及统筹组(MPCU)成员和区议会成员中,利益相关者参与项目和计划的M&E的比例很高,但在分区议会和社区层面则较低。这对项目和方案的透明度、问责制和维持产生了不利影响。该研究得出结论,由于MPCU缺乏对基层利益相关者参与的协调努力,以及社区层面利益相关者对项目和计划的评估态度不佳,利益相关者很少参与项目和计划的评估。MPCU和议会成员的参与程度相当高,而联检组委员会、社区和地区理事会的参与程度较低。该研究建议,地区议会应通过MPCU制定战略,例如增加子结构在规划、实施、监测和评估过程中的参与,为子结构制定自己的目标创造有利环境,支持它们实现目标,并建立它们定期向所属社区和市议会报告的能力。市议会应与次级结构合作,开始提高社区对项目和方案的参与性监测和评价的认识。关键词:参与式监测与评估,利益相关者,社区参与,项目,方案,saveluguu - nanton
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信