Using Enhancement Method to Improve Earned Value Index to Achieve an Accurate Project Time and Cost Estimation

I. Attarzadeh, Ow Siew Hock
{"title":"Using Enhancement Method to Improve Earned Value Index to Achieve an Accurate Project Time and Cost Estimation","authors":"I. Attarzadeh, Ow Siew Hock","doi":"10.1109/ICFCC.2009.68","DOIUrl":null,"url":null,"abstract":"This paper presents how to use enhancement method to improve Earned Value (EV) method of projects. This method improves earned value management system (EVMS) and forecasting time and cost for projects. These method use established consists of four variables: Scheduled Performance Index (SPI), Cost Performance Index (CPI), Cost Variance (CV), Schedule Variance (SV). The model has been validated by a simulation study using a progress generator a new software. This software was developed in Visual Studio 2008 – Visual Basic .NET 2008 and Microsoft Office Project 2007 and it included some basic assumptions and data were generated day by day randomly. The results show a strong relationship between response variable and above four predictors. Therefore, it can be concluded that the model could be used in a wide range of projects for EAC estimation.","PeriodicalId":338489,"journal":{"name":"2009 International Conference on Future Computer and Communication","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-04-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 International Conference on Future Computer and Communication","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICFCC.2009.68","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

This paper presents how to use enhancement method to improve Earned Value (EV) method of projects. This method improves earned value management system (EVMS) and forecasting time and cost for projects. These method use established consists of four variables: Scheduled Performance Index (SPI), Cost Performance Index (CPI), Cost Variance (CV), Schedule Variance (SV). The model has been validated by a simulation study using a progress generator a new software. This software was developed in Visual Studio 2008 – Visual Basic .NET 2008 and Microsoft Office Project 2007 and it included some basic assumptions and data were generated day by day randomly. The results show a strong relationship between response variable and above four predictors. Therefore, it can be concluded that the model could be used in a wide range of projects for EAC estimation.
运用增强法改进挣值指标,实现对项目时间和成本的准确估算
本文介绍了如何利用增强法改进项目挣值法。该方法改进了挣值管理系统(EVMS)和预测项目的时间和成本。这些方法建立了四个变量:计划绩效指数(SPI)、成本绩效指数(CPI)、成本方差(CV)、计划方差(SV)。利用进度生成器软件进行了仿真研究,验证了模型的有效性。本软件是在Visual Studio 2008 - Visual Basic . net 2008和Microsoft Office Project 2007中开发的,它包含了一些基本的假设,数据是每天随机生成的。结果表明,反应变量与上述四个预测因子之间存在较强的相关性。因此,可以得出结论,该模型可以在广泛的项目中用于EAC估算。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信