Large scale integration of wind energy in Colombia: Electrical analysis-part I

I. Isaac, J. Gonzalez, J. Areiza, H. Biechl, H. Cardona, G. Lopez
{"title":"Large scale integration of wind energy in Colombia: Electrical analysis-part I","authors":"I. Isaac, J. Gonzalez, J. Areiza, H. Biechl, H. Cardona, G. Lopez","doi":"10.1109/TDC-LA.2010.5762887","DOIUrl":null,"url":null,"abstract":"This work is the first part of a study that aims to analyze the technical and economic implications of the penetration of wind power in the Colombian Interconnected system (SIN). Using the software DigSilent™, studies of steady state, contingencies and short-circuit were conducted in order to identify problems of stress, overload, voltage profiles, transmission bottlenecks and the most neuralgic elements for the operation of the proposed wind parks. Additional electrical studies, such as stability, power quality, voltage ride through capability, and the development of some indicators associated with the penetration of wind power in Colombia, will be addressed on a second part of this work.","PeriodicalId":222318,"journal":{"name":"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-05-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC-LA.2010.5762887","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

This work is the first part of a study that aims to analyze the technical and economic implications of the penetration of wind power in the Colombian Interconnected system (SIN). Using the software DigSilent™, studies of steady state, contingencies and short-circuit were conducted in order to identify problems of stress, overload, voltage profiles, transmission bottlenecks and the most neuralgic elements for the operation of the proposed wind parks. Additional electrical studies, such as stability, power quality, voltage ride through capability, and the development of some indicators associated with the penetration of wind power in Colombia, will be addressed on a second part of this work.
哥伦比亚风能的大规模整合:电气分析-第一部分
这项工作是一项研究的第一部分,旨在分析哥伦比亚互联系统(SIN)中风电渗透的技术和经济影响。利用DigSilent™软件,对稳态、突发事件和短路进行了研究,以确定拟议风电场运行中的应力、过载、电压分布、传输瓶颈和最棘手的因素。这项工作的第二部分将讨论其他电气研究,例如稳定性、电力质量、电压穿越能力以及制定与哥伦比亚风力发电渗透有关的一些指标。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信