An improved approach for the quay crane assignment problem with limited availability of internal trucks in container terminal

A. Karam, A. Eltawil, N. Harraz
{"title":"An improved approach for the quay crane assignment problem with limited availability of internal trucks in container terminal","authors":"A. Karam, A. Eltawil, N. Harraz","doi":"10.1109/IEEM.2014.7058611","DOIUrl":null,"url":null,"abstract":"In container terminals, the handling operation of containers depends on the interaction among handling equipment such as quay cranes, yard cranes and internal trucks. Insufficient number of internal trucks causes a delay in transporting containers and results in low productivity of quay cranes which is the bottleneck of any container terminal. This paper presents a new approach for assigning quay cranes in container terminal taking into consideration the availability of internal truscks. A two phase solution methodology is proposed. In the first phase, a MIP model is formulated to assign quay cranes to vessels while in the second phase, dynamic programming is used to determine the specific quay cranes to serve each vessel. The validity of the proposed approach is demonstrated by a comparison against a case study from literature. Moreover, the results show that the shortage in the required number of internal trucks increases the average handling time per vessel.","PeriodicalId":318405,"journal":{"name":"2014 IEEE International Conference on Industrial Engineering and Engineering Management","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE International Conference on Industrial Engineering and Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2014.7058611","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

Abstract

In container terminals, the handling operation of containers depends on the interaction among handling equipment such as quay cranes, yard cranes and internal trucks. Insufficient number of internal trucks causes a delay in transporting containers and results in low productivity of quay cranes which is the bottleneck of any container terminal. This paper presents a new approach for assigning quay cranes in container terminal taking into consideration the availability of internal truscks. A two phase solution methodology is proposed. In the first phase, a MIP model is formulated to assign quay cranes to vessels while in the second phase, dynamic programming is used to determine the specific quay cranes to serve each vessel. The validity of the proposed approach is demonstrated by a comparison against a case study from literature. Moreover, the results show that the shortage in the required number of internal trucks increases the average handling time per vessel.
集装箱码头内车有限情况下码头起重机分配问题的改进方法
在集装箱码头,集装箱的装卸作业依赖于码头起重机、堆场起重机和内部卡车等装卸设备之间的相互作用。集装箱内部车辆数量不足,造成集装箱运输的延误,导致码头起重机的生产率低下,这是任何集装箱码头的瓶颈。本文提出了一种考虑内车可用性的集装箱码头码头起重机分配新方法。提出了一种两阶段求解方法。在第一阶段,建立了MIP模型,为船舶分配码头起重机;在第二阶段,采用动态规划方法确定为每艘船舶服务的具体码头起重机。通过与文献中的一个案例研究的比较,证明了所提出方法的有效性。此外,结果表明,所需内部卡车数量的短缺增加了每艘船的平均装卸时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信