{"title":"Mengkategorikan Resiko Kecelakaan Kerja Konstruksi Pada Proyek Pembangunan Pasar Pon Kabupaten Trenggalek Menggunakan Matriks Penilaian Resiko","authors":"R. Nurmala, S. Suwarno, Moch. Zaenuri Arifin","doi":"10.30737/jurmateks.v4i2.2111","DOIUrl":null,"url":null,"abstract":"Construction work accidents become part of construction activities that need to be considered. Work accidents cause considerable losses so that there needs to be proper management of the work safety system. Definition of the risks that occur in construction activities can be done to reduce losses incurred. This research aims to categorize the risk of work accidents that occur in the Trenggalek Regency Pon Market development project. Categorize is done using the risk assessment matrix according to AS /NZS 4360:2004 so that the risk grouping category is obtained. Research methods use quantitative descriptive. The research population of 100 workers consisting of team leaders, architectural experts, structural civil experts, mechanical experts, experts, drafters, project administration, supervisors, artisans and workers with a total of 50 respondents. Data collection is done by distributing questionnaires to respondents. From the results of the questionnaire conducted validity testing and reliability test using IBMSPSS Statistic software. The results of the study obtained the risks that occurred categorized at low and medium levels. At the medium level probability with a scale often occurs that is the type of wound on the limbs. While probability with scale can occur at any time, namely the type of injury on the hand. So that from these results, risk control can be done and what things must be done to avoid work accidents in the Trenggalek Regency Pon Market development project.","PeriodicalId":382880,"journal":{"name":"Jurnal Manajemen Teknologi & Teknik Sipil","volume":"58 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Manajemen Teknologi & Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30737/jurmateks.v4i2.2111","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Construction work accidents become part of construction activities that need to be considered. Work accidents cause considerable losses so that there needs to be proper management of the work safety system. Definition of the risks that occur in construction activities can be done to reduce losses incurred. This research aims to categorize the risk of work accidents that occur in the Trenggalek Regency Pon Market development project. Categorize is done using the risk assessment matrix according to AS /NZS 4360:2004 so that the risk grouping category is obtained. Research methods use quantitative descriptive. The research population of 100 workers consisting of team leaders, architectural experts, structural civil experts, mechanical experts, experts, drafters, project administration, supervisors, artisans and workers with a total of 50 respondents. Data collection is done by distributing questionnaires to respondents. From the results of the questionnaire conducted validity testing and reliability test using IBMSPSS Statistic software. The results of the study obtained the risks that occurred categorized at low and medium levels. At the medium level probability with a scale often occurs that is the type of wound on the limbs. While probability with scale can occur at any time, namely the type of injury on the hand. So that from these results, risk control can be done and what things must be done to avoid work accidents in the Trenggalek Regency Pon Market development project.
将Trenggalek县新兴市场建设项目的施工事故风险与风险评估矩阵进行分类
建筑施工事故成为建筑施工活动中需要考虑的一部分。工作事故造成的损失相当大,因此需要对安全生产制度进行适当的管理。定义建筑活动中发生的风险可以减少损失。本研究的目的是对丁加勒摄政市场开发项目中发生的工作事故风险进行分类。根据AS /NZS 4360:2004使用风险评估矩阵进行分类,从而获得风险分组类别。研究方法采用定量描述。研究人群为100名工人,包括组长、建筑专家、结构土建专家、机械专家、专家、起草人、项目管理、主管、工匠和工人,共50名受访者。数据收集是通过向受访者分发调查问卷来完成的。利用IBMSPSS统计软件对问卷结果进行了效度检验和信度检验。研究结果得出了发生的风险分为低和中等水平。在中等水平的概率中,经常出现的是四肢上的伤口类型。而概率与尺度在任何时候都可以发生,即手部的伤害类型。因此,从这些结果中,可以做风险控制,以及应该做些什么来避免丁加勒摄政市场开发项目的工作事故。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书