{"title":"Research on Integrated Automatic Control System for Railway Station Receiving and Dispatching Line Confirmation","authors":"Xiaoyan Yang","doi":"10.1145/3565387.3565436","DOIUrl":null,"url":null,"abstract":"To the misoperation of the electric locomotives being pulled into to no electricity unit (area), over-limited trains entering into non-specified track while the planned power failure of catenary contact electric lines of railway enterprise, this paper proposes a \"Three-elements and double confirmation\" processing and comparison method based on RF identification, screen mouse coordinates and high-definition imaging analysis of dynamic blackout operation area data comparison library, the entire data collection, it's analysis and logic judgment process does not interfere with the current running-related systems, also it avoids the complex procedures of obtaining existing system interface rights and it is an external independent early warning system . The use of the system effectively prevents the electric locomotive from entering the powerless area (network) and the accident of over-limited cargo loaded trains being discharged into the wrong track, hoping to provide some reference value to the railway field.","PeriodicalId":182491,"journal":{"name":"Proceedings of the 6th International Conference on Computer Science and Application Engineering","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 6th International Conference on Computer Science and Application Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/3565387.3565436","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
To the misoperation of the electric locomotives being pulled into to no electricity unit (area), over-limited trains entering into non-specified track while the planned power failure of catenary contact electric lines of railway enterprise, this paper proposes a "Three-elements and double confirmation" processing and comparison method based on RF identification, screen mouse coordinates and high-definition imaging analysis of dynamic blackout operation area data comparison library, the entire data collection, it's analysis and logic judgment process does not interfere with the current running-related systems, also it avoids the complex procedures of obtaining existing system interface rights and it is an external independent early warning system . The use of the system effectively prevents the electric locomotive from entering the powerless area (network) and the accident of over-limited cargo loaded trains being discharged into the wrong track, hoping to provide some reference value to the railway field.