FIFTY YEARS OF CONSTRUCTION COST-REDUCING ANALYSES

R. L. Peurifoy
{"title":"FIFTY YEARS OF CONSTRUCTION COST-REDUCING ANALYSES","authors":"R. L. Peurifoy","doi":"10.1061/JCCEAZ.0000500","DOIUrl":null,"url":null,"abstract":"The purpose of this paper is to present and consider some, but not necessarily all, of the methods that have been developed during the past 50 yr, to enable engineers, architects, contractors, and other persons associated with the construction industry to preplan, plan, and analyze construction operations in order to reduce the costs of construction operations and to provide other beneficial services. The time alloted to this paper will preclude a lengthy consideration of each method. The Appendix gives sources of additional information that describe the methods more fully.","PeriodicalId":271903,"journal":{"name":"Journal of the Construction Division","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1975-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of the Construction Division","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/JCCEAZ.0000500","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The purpose of this paper is to present and consider some, but not necessarily all, of the methods that have been developed during the past 50 yr, to enable engineers, architects, contractors, and other persons associated with the construction industry to preplan, plan, and analyze construction operations in order to reduce the costs of construction operations and to provide other beneficial services. The time alloted to this paper will preclude a lengthy consideration of each method. The Appendix gives sources of additional information that describe the methods more fully.
五十年建筑成本降低分析
本文的目的是介绍和考虑过去50年来发展起来的一些方法,但不一定是全部方法,使工程师、建筑师、承包商和其他与建筑行业相关的人能够预先规划、计划和分析建筑作业,以降低建筑作业的成本并提供其他有益的服务。分配给本文的时间将排除对每种方法的冗长考虑。附录提供了更完整地描述这些方法的附加信息的来源。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信