Digitalization and Automation of the Planning and Execution of Well Construction Process

A. Ruzhnikov, E. Echevarria, Choon Kit Phan
{"title":"Digitalization and Automation of the Planning and Execution of Well Construction Process","authors":"A. Ruzhnikov, E. Echevarria, Choon Kit Phan","doi":"10.2118/209883-ms","DOIUrl":null,"url":null,"abstract":"\n Well construction process can be presented as a set of the routine and repetitive actions which should be repeated at the planning, execution and evaluation stages. The manuscript describes how in the effort with major operating company the well planning stage was converted to a complete digital path; and how the digitalization of the planning was further transferred to the automated execution.\n Planning a well normally done with different computer software, where the data gathered from different engineering software should be input, as well as required drilling fluid, cementing and directional job plans and limits etc., followed by the written operational sequence. In the reviewed case all the planning was shifted to the cloud environment, including all simulations and reviews, where no \"merge\" of the data was required. All the required simulations are performed automatically, flagging those with the results out of the limit. The operational steps were detailed, and further connected to the rig Variable Frequency Drives (VFD) system, where multiple operations started to be performed in automatic mode, without any intervention from the rig crew (like survey, drilling parameters automatically adjusted to the sock and vibration, stick and slip, seeking for the best rate of penetration, driller's tasks while drilling, backreaming of stand etc.).\n The implementation of the digital planning allowed to align all stockholders involved during design stage, minimize human mistakes, and significantly decrease the planning time. The noticeable side effect is absence of any physical paper and as well as higher transparency during preparation. At the execution stage at the begging of the implementation the main benefit came from the standardization of the practices at the rig, what lead to absence of discrepancies. It further resulted in delivery of the all the wells under the same time with very minimum difference. And the final positive result came from the absence of any major service quality event (like stuck pipe) during automated operations. As of now the different levels of digitalization are implemented in 16 rigs, with further current expansion.\n The manuscript provides the novel information on the digitalization and automation of the well construction process. The explained methodology can be implemented at any project worldwide.","PeriodicalId":385340,"journal":{"name":"Day 1 Tue, August 09, 2022","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, August 09, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/209883-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Well construction process can be presented as a set of the routine and repetitive actions which should be repeated at the planning, execution and evaluation stages. The manuscript describes how in the effort with major operating company the well planning stage was converted to a complete digital path; and how the digitalization of the planning was further transferred to the automated execution. Planning a well normally done with different computer software, where the data gathered from different engineering software should be input, as well as required drilling fluid, cementing and directional job plans and limits etc., followed by the written operational sequence. In the reviewed case all the planning was shifted to the cloud environment, including all simulations and reviews, where no "merge" of the data was required. All the required simulations are performed automatically, flagging those with the results out of the limit. The operational steps were detailed, and further connected to the rig Variable Frequency Drives (VFD) system, where multiple operations started to be performed in automatic mode, without any intervention from the rig crew (like survey, drilling parameters automatically adjusted to the sock and vibration, stick and slip, seeking for the best rate of penetration, driller's tasks while drilling, backreaming of stand etc.). The implementation of the digital planning allowed to align all stockholders involved during design stage, minimize human mistakes, and significantly decrease the planning time. The noticeable side effect is absence of any physical paper and as well as higher transparency during preparation. At the execution stage at the begging of the implementation the main benefit came from the standardization of the practices at the rig, what lead to absence of discrepancies. It further resulted in delivery of the all the wells under the same time with very minimum difference. And the final positive result came from the absence of any major service quality event (like stuck pipe) during automated operations. As of now the different levels of digitalization are implemented in 16 rigs, with further current expansion. The manuscript provides the novel information on the digitalization and automation of the well construction process. The explained methodology can be implemented at any project worldwide.
建井过程规划与执行的数字化与自动化
建井过程可以表现为一系列在规划、执行和评价阶段应重复进行的常规和重复操作。该手稿描述了在主要运营公司的努力下,如何将井计划阶段转换为完整的数字路径;以及如何将规划的数字化进一步转化为自动化执行。规划井通常使用不同的计算机软件完成,从不同的工程软件收集的数据应该输入,以及所需的钻井液,固井和定向作业计划和限制等,然后是书面操作顺序。在审查的案例中,所有的计划都转移到云环境中,包括所有的模拟和审查,在那里不需要“合并”数据。所有需要的模拟都是自动执行的,标记那些结果超出限制的模拟。作业步骤详细,并进一步连接到钻机变频驱动(VFD)系统,在该系统中,多个操作开始在自动模式下执行,而无需钻机人员的任何干预(如测量,自动调整钻井参数到sock和振动,粘滑,寻求最佳钻速,钻井时司钻的任务,支架的回孔等)。数字化规划的实施可以在设计阶段协调所有相关股东,最大限度地减少人为错误,并显着缩短规划时间。明显的副作用是没有任何物理纸,以及在准备过程中更高的透明度。在实施的执行阶段,主要的好处来自于钻井平台实践的标准化,这导致了没有差异。这进一步实现了所有井在同一时间内以极小的差异交付。最终的积极结果来自于在自动化操作期间没有任何重大的服务质量事件(如卡管)。截至目前,已在16个钻井平台上实施了不同程度的数字化,目前还在进一步扩展。该手稿提供了关于油井建设过程的数字化和自动化的新信息。所解释的方法可以在世界范围内的任何项目中实施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信