{"title":"Research on BIM intelligent management technology of wharf construction schedule based on Improved Genetic Algorithm","authors":"Y. Jia, Haifeng Wang","doi":"10.1109/acait53529.2021.9731118","DOIUrl":null,"url":null,"abstract":"It was inevitable for the construction industry to develop the project management in an information and intelligence way. This time, the construction information model of the dock project was built with the help of BIM technology and genetic calculation, and the intelligent management of the construction progress was carried out based on it. Through the analysis of the targets in the progress plan, the math relationship between the best targets was obtained, and the BIM construction progress plan based on the genetic calculation was also improved. Through the simulation analysis of a dock in Tianjin, it could be seen that with the construction information model, the intelligent management of the construction progress of the dock could realize the dynamic tracking and control of the construction progress, and it was also conducive to the overall control of the construction progress.","PeriodicalId":173633,"journal":{"name":"2021 5th Asian Conference on Artificial Intelligence Technology (ACAIT)","volume":"98 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 5th Asian Conference on Artificial Intelligence Technology (ACAIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/acait53529.2021.9731118","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
It was inevitable for the construction industry to develop the project management in an information and intelligence way. This time, the construction information model of the dock project was built with the help of BIM technology and genetic calculation, and the intelligent management of the construction progress was carried out based on it. Through the analysis of the targets in the progress plan, the math relationship between the best targets was obtained, and the BIM construction progress plan based on the genetic calculation was also improved. Through the simulation analysis of a dock in Tianjin, it could be seen that with the construction information model, the intelligent management of the construction progress of the dock could realize the dynamic tracking and control of the construction progress, and it was also conducive to the overall control of the construction progress.