{"title":"Research on BIM intelligent management technology of wharf construction schedule based on Improved Genetic Algorithm","authors":"Y. Jia, Haifeng Wang","doi":"10.1109/acait53529.2021.9731118","DOIUrl":null,"url":null,"abstract":"It was inevitable for the construction industry to develop the project management in an information and intelligence way. This time, the construction information model of the dock project was built with the help of BIM technology and genetic calculation, and the intelligent management of the construction progress was carried out based on it. Through the analysis of the targets in the progress plan, the math relationship between the best targets was obtained, and the BIM construction progress plan based on the genetic calculation was also improved. Through the simulation analysis of a dock in Tianjin, it could be seen that with the construction information model, the intelligent management of the construction progress of the dock could realize the dynamic tracking and control of the construction progress, and it was also conducive to the overall control of the construction progress.","PeriodicalId":173633,"journal":{"name":"2021 5th Asian Conference on Artificial Intelligence Technology (ACAIT)","volume":"98 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 5th Asian Conference on Artificial Intelligence Technology (ACAIT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/acait53529.2021.9731118","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

It was inevitable for the construction industry to develop the project management in an information and intelligence way. This time, the construction information model of the dock project was built with the help of BIM technology and genetic calculation, and the intelligent management of the construction progress was carried out based on it. Through the analysis of the targets in the progress plan, the math relationship between the best targets was obtained, and the BIM construction progress plan based on the genetic calculation was also improved. Through the simulation analysis of a dock in Tianjin, it could be seen that with the construction information model, the intelligent management of the construction progress of the dock could realize the dynamic tracking and control of the construction progress, and it was also conducive to the overall control of the construction progress.
基于改进遗传算法的码头施工进度BIM智能管理技术研究
建设行业项目管理向信息化、智能化方向发展是必然趋势。本次借助BIM技术和遗传计算,构建了码头项目的施工信息模型,并在此基础上进行了施工进度的智能管理。通过对进度计划中的目标进行分析,得到最佳目标之间的数学关系,并对基于遗传计算的BIM施工进度计划进行改进。通过对天津某码头的仿真分析可以看出,利用施工信息模型对码头施工进度进行智能管理,可以实现对施工进度的动态跟踪和控制,也有利于施工进度的整体控制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信