K. Raghavan, Jonathan D. Burlison, Edward M. Sanders II, M. Rossi
{"title":"Independent Double-check of Infusion Pump Programming: An Anesthesia Improvement Effort to Reduce harm.","authors":"K. Raghavan, Jonathan D. Burlison, Edward M. Sanders II, M. Rossi","doi":"10.1097/pq9.0000000000000596","DOIUrl":null,"url":null,"abstract":"Introduction: Significant adverse drug events (ADEs) due to anesthesia infusion pump programming errors were reported at our institution. We incorporated independent two-provider infusion pump programming verification, an evidence-supported intervention, into our anesthesia medication infusion process with a goal of reducing associated ADEs to zero in 2 years. Methods: Using the model for improvement, we developed key drivers and interventions and utilized plan-do-study-act (PDSA) cycles. Drivers included education and training, verification process, visual aids, information technology, and safety culture. Interventions included anesthesia provider training, information dissemination, independent two-provider verification process of smart pump programming, verification documentation capability, verification compliance tracking, and visual aids. Our outcome measures were relevant ADEs and near-miss events. Process and balancing measures were the percentage of smart pump programs with independent second verification and delayed case starts due to second provider verification, respectively. Results: During the project period, only one related grade E ADE occurred, and the root cause was not conducting an independent pump programming verification. Thirteen grade B near-miss events were prevented due to independent second verification. Second verification adherence reached 85% and was sustained, and no delayed case starts occurred. Conclusions: With structured quality improvement methods, the process of independent two-provider verification of infusion pump programming during anesthesia can be successfully implemented, and errors in a high-volume setting reduced without negatively affecting case start times. The cultural and organizational factors we report may aid other institutions in gaining project buy-in and sustainment.","PeriodicalId":343243,"journal":{"name":"Pediatric Quality and Safety","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Pediatric Quality and Safety","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1097/pq9.0000000000000596","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Introduction: Significant adverse drug events (ADEs) due to anesthesia infusion pump programming errors were reported at our institution. We incorporated independent two-provider infusion pump programming verification, an evidence-supported intervention, into our anesthesia medication infusion process with a goal of reducing associated ADEs to zero in 2 years. Methods: Using the model for improvement, we developed key drivers and interventions and utilized plan-do-study-act (PDSA) cycles. Drivers included education and training, verification process, visual aids, information technology, and safety culture. Interventions included anesthesia provider training, information dissemination, independent two-provider verification process of smart pump programming, verification documentation capability, verification compliance tracking, and visual aids. Our outcome measures were relevant ADEs and near-miss events. Process and balancing measures were the percentage of smart pump programs with independent second verification and delayed case starts due to second provider verification, respectively. Results: During the project period, only one related grade E ADE occurred, and the root cause was not conducting an independent pump programming verification. Thirteen grade B near-miss events were prevented due to independent second verification. Second verification adherence reached 85% and was sustained, and no delayed case starts occurred. Conclusions: With structured quality improvement methods, the process of independent two-provider verification of infusion pump programming during anesthesia can be successfully implemented, and errors in a high-volume setting reduced without negatively affecting case start times. The cultural and organizational factors we report may aid other institutions in gaining project buy-in and sustainment.