{"title":"ANALYSING THE DRAINAGE SYSTEM USING EPA SWMM 5.1 (STUDY CASE: JABABEKA II INDUSTRIAL, CIKARANG BARU, BEKASI REGENCY)","authors":"Kezia Kusumaningtyas, Y. Ismail","doi":"10.33021/JENV.V5I2.1234","DOIUrl":null,"url":null,"abstract":"Due to the data in 2030, the urban growth in developed countries is 83% and developing countries is 53%. Jababeka II Industrial Estate as one of the urban industrialization located at Bekasi Regency. In its development, drainage facilities are one thing that must be considered. Because with its function as a channel that carries runoff water to rivers/lakes/reservoirs to avoid flooding. This study aimed to know the existing condition of the drainage system and the water balances in the form of runoff in Jababeka II Industrial Estate by the simulation of SWMM 5.1.  The method of this research used a quantitative method, and the data collection method used secondary data, including the information from the existing drainage system with precipitation events in 12 years (2009-2020) were obtained from the WTP Jababeka Residential, drainage dimension, and masterplan of Jababeka II. In order to calculate rainfall planned used fifth-year return period based, it’s on the city's classification under study. The probability distribution method uses Log-Pearson III with a planned rainfall of 128.22 mm/d and the highest rainfall intensity of 54 mm. Based on the simulation results, it was found that the Jababeka II Industrial Estate contained puddles in several channels. The peak was at the 3rd hour of the simulation, which were 19 channels. It's influenced by the type of soil that is quickly saturated. The simulation of the existing condition at Jababeka II has the highest runoff at the 2nd hour of simulation, and floods occurred in 19 channels. It’s affected by the impermeable sub-areas. The water balance result is the amount of precipitation 128.22 mm with the intensity is 54mm due to 5 years forecasting, thus producing the outflow is 128.511 mm. Therefore the number of continuity errors of the surface is -0.227%.","PeriodicalId":371727,"journal":{"name":"Journal of Environmental Engineering and Waste Management","volume":"74 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Environmental Engineering and Waste Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33021/JENV.V5I2.1234","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Due to the data in 2030, the urban growth in developed countries is 83% and developing countries is 53%. Jababeka II Industrial Estate as one of the urban industrialization located at Bekasi Regency. In its development, drainage facilities are one thing that must be considered. Because with its function as a channel that carries runoff water to rivers/lakes/reservoirs to avoid flooding. This study aimed to know the existing condition of the drainage system and the water balances in the form of runoff in Jababeka II Industrial Estate by the simulation of SWMM 5.1.  The method of this research used a quantitative method, and the data collection method used secondary data, including the information from the existing drainage system with precipitation events in 12 years (2009-2020) were obtained from the WTP Jababeka Residential, drainage dimension, and masterplan of Jababeka II. In order to calculate rainfall planned used fifth-year return period based, it’s on the city's classification under study. The probability distribution method uses Log-Pearson III with a planned rainfall of 128.22 mm/d and the highest rainfall intensity of 54 mm. Based on the simulation results, it was found that the Jababeka II Industrial Estate contained puddles in several channels. The peak was at the 3rd hour of the simulation, which were 19 channels. It's influenced by the type of soil that is quickly saturated. The simulation of the existing condition at Jababeka II has the highest runoff at the 2nd hour of simulation, and floods occurred in 19 channels. It’s affected by the impermeable sub-areas. The water balance result is the amount of precipitation 128.22 mm with the intensity is 54mm due to 5 years forecasting, thus producing the outflow is 128.511 mm. Therefore the number of continuity errors of the surface is -0.227%.
利用epa swmm5.1对排水系统进行分析(研究案例:jababeka ii industrial, cikarang baru, bekasi regency)
根据2030年的数据,发达国家的城市增长率为83%,发展中国家为53%。Jababeka II工业地产作为城市工业化之一,位于贝卡西摄政。在其发展中,排水设施是必须考虑的一件事。因为它的功能是将径流水输送到河流/湖泊/水库,以避免洪水泛滥。本研究旨在通过SWMM 5.1的模拟,了解Jababeka II工业园区的排水系统现状和径流形式的水平衡情况。本研究方法采用定量方法,数据收集方法采用二次数据,包括现有排水系统信息和2009-2020年12年降水事件,分别来自WTP Jababeka住宅、排水维度和Jababeka II总体规划。为了计算降雨量计划使用第五年的回归期为基础,它是在城市的分类研究。概率分布法采用Log-Pearson III,计划降雨量为128.22 mm/d,最高降雨强度为54 mm。根据模拟结果,发现Jababeka II工业区在几个通道中含有水坑。峰值出现在模拟的第3小时,共19个通道。它受到土壤类型的影响,土壤类型很快就会饱和。在Jababeka II现有条件下,模拟第2 h的径流量最大,有19个通道发生洪水。它受到不透水分区的影响。经5年预报,水量平衡结果为降水量128.22 mm,强度54mm,出水量128.511 mm。因此,曲面的连续误差数为-0.227%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信