{"title":"Project management under uncertainty: using flexible resource management to exploit schedule flexibility","authors":"João Faria, M. Araújo, E. Demeulemeester, Anabela Tereso","doi":"10.1504/ejie.2020.109899","DOIUrl":null,"url":null,"abstract":"Project management still faces a wide gap separating theory from practice, especially regarding the robustness of the generated project schedules facing the omnipresence of uncertainty. A new approach to deal with uncertainty is presented to explore slack that might exist in a given project schedule. We propose that renewable resources' capacity to perform work can be increased so that they can perform additional work in a time unit or can be decreased with the consequent reduction on the performed work. This possibility combined with the slack that some activities have in a specific schedule can be used to absorb deviations that might occur during a project's execution. When a critical activity is about to have its duration increased, slowing down other non-critical activities by putting their resources in a decreased work mode enables the activity to still be executed within time by using resources in an increased working mode. [Received: 14 February 2018; Revised: 2 January 2019; Revised: 8 June 2019; Accepted: 17 November 2019]","PeriodicalId":314867,"journal":{"name":"European J. of Industrial Engineering","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European J. of Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ejie.2020.109899","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Project management still faces a wide gap separating theory from practice, especially regarding the robustness of the generated project schedules facing the omnipresence of uncertainty. A new approach to deal with uncertainty is presented to explore slack that might exist in a given project schedule. We propose that renewable resources' capacity to perform work can be increased so that they can perform additional work in a time unit or can be decreased with the consequent reduction on the performed work. This possibility combined with the slack that some activities have in a specific schedule can be used to absorb deviations that might occur during a project's execution. When a critical activity is about to have its duration increased, slowing down other non-critical activities by putting their resources in a decreased work mode enables the activity to still be executed within time by using resources in an increased working mode. [Received: 14 February 2018; Revised: 2 January 2019; Revised: 8 June 2019; Accepted: 17 November 2019]