EVALUASI KINERJA SALURAN IRIGASI DAN BANGUNAN DISTRIBUSI PADA DAERAH IRIGASI AIR NAKAI BATU ROTO BENGKULU UTARA

Salsabillah Anisa putri, Besperi, Samsul Bahri, Razali Makmun Reza
{"title":"EVALUASI KINERJA SALURAN IRIGASI DAN BANGUNAN DISTRIBUSI PADA DAERAH IRIGASI AIR NAKAI BATU ROTO BENGKULU UTARA","authors":"Salsabillah Anisa putri, Besperi, Samsul Bahri, Razali Makmun Reza","doi":"10.33369/ijts.15.1.65-76","DOIUrl":null,"url":null,"abstract":" \n\n\n\nThis study intends to analyze the dimensions of the channel, subdivision, and tapping infrastructure. The mainstay discharge was analyzed using the Mock method, the analysis of irrigation water needs was based on Irrigation Planning Standard KP-01, and recalculation of the dimensions of the channel, building for, and tapping building based on the existing discharge and the planned discharge in accordance with Irrigation Planning Standard KP- 03. Rainfall data were analyzed using the algebraic average method. The findings indicated that the highest primary discharge, which occurred in November period I, was 9.21 m3/s. The highest amount of clean water needed in the fields per day (NFR) was 7.55 mm, while the maximum amount of water needed for intake per second (DR) was 1.34 l/sec. The bottom width of the channel (b) is 2.26 m according to the findings of recalculating the BNa 1 primary channel's dimensions using the current discharge. Na.2Ki.A secondary channel measured 0.48 meters for channel bottom width (b). The bottom width of the channel (b) was determined to be 0.601 m as a consequence of recalculating the BNa 1 primary channel's dimensions using the intended discharge. Na.2Ki.A secondary channel measured 0.44 meters for channel bottom width (b). The measurements of the width of the buildings door (b) after being recalculated and tapped based on the current discharge are larger than those of the door's existing dimensions.\nKeywords: Water Discharge, Irrigation Channels Area, Distribution Building\n\n\n","PeriodicalId":168083,"journal":{"name":"Inersia: Jurnal Teknik Sipil","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Inersia: Jurnal Teknik Sipil","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33369/ijts.15.1.65-76","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

  This study intends to analyze the dimensions of the channel, subdivision, and tapping infrastructure. The mainstay discharge was analyzed using the Mock method, the analysis of irrigation water needs was based on Irrigation Planning Standard KP-01, and recalculation of the dimensions of the channel, building for, and tapping building based on the existing discharge and the planned discharge in accordance with Irrigation Planning Standard KP- 03. Rainfall data were analyzed using the algebraic average method. The findings indicated that the highest primary discharge, which occurred in November period I, was 9.21 m3/s. The highest amount of clean water needed in the fields per day (NFR) was 7.55 mm, while the maximum amount of water needed for intake per second (DR) was 1.34 l/sec. The bottom width of the channel (b) is 2.26 m according to the findings of recalculating the BNa 1 primary channel's dimensions using the current discharge. Na.2Ki.A secondary channel measured 0.48 meters for channel bottom width (b). The bottom width of the channel (b) was determined to be 0.601 m as a consequence of recalculating the BNa 1 primary channel's dimensions using the intended discharge. Na.2Ki.A secondary channel measured 0.44 meters for channel bottom width (b). The measurements of the width of the buildings door (b) after being recalculated and tapped based on the current discharge are larger than those of the door's existing dimensions. Keywords: Water Discharge, Irrigation Channels Area, Distribution Building
对纳奈岩石罗托班古鲁灌溉区域的灌溉渠和配送建设的评估
本研究旨在分析渠道、细分和开发基础设施的维度。采用模拟法对主体流量进行分析,根据灌溉规划标准KP-01对灌溉需水量进行分析,根据灌溉规划标准KP- 03对现有流量和规划流量进行渠道、建筑、引水建筑尺寸的重新计算。降雨资料采用代数平均法进行分析。结果表明,11月1日的初流量最大,为9.21 m3/s。田间每天需水量最高(NFR)为7.55 mm,每秒需水量最大(DR)为1.34 l/sec。根据使用电流重新计算BNa 1主通道尺寸的结果,通道(b)的底部宽度为2.26 m。Na.2Ki。次级通道底部宽度为0.48米(b)。通过使用预期流量重新计算BNa 1主通道的尺寸,确定了通道底部宽度(b)为0.601米。Na.2Ki。二次通道底部宽度(b)为0.44米。建筑物门宽度(b)根据电流流量重新计算并抽头后的测量值大于门的现有尺寸。关键词:排水,灌溉渠面积,配电网
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信