{"title":"The German transmission grid expansion in long-term perspective — What is the impact of renewable integration?","authors":"David Gunkel, Dominik Most","doi":"10.1109/EEM.2014.6861219","DOIUrl":null,"url":null,"abstract":"The German power sector will face a profound change from conventional power generation to an energy system with a high share of intermittent renewable energy sources. The following analysis addresses the future transmission grid design for Germany in 2030 in a context of different renewable integration schemes. Therefore a DC load flow model is set-up, which deals with the trade-off between grid expansion and regional renewable integration. Two scenarios concerning different renewable feed-in design options are considered: curtailment of renewables only at negative prices in the height of their individual levelized costs of electricity, and curtailment at marginal costs (tending to zero). To cope with the large-scale network capacity expansion problem, Benders Decomposition and DC-load flow approximation are applied. The results show that the different renewable integration schemes have different effects on the AC grid expansions in contrast to High-Voltage-Direct-Current (HVDC) connections.","PeriodicalId":261127,"journal":{"name":"11th International Conference on the European Energy Market (EEM14)","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th International Conference on the European Energy Market (EEM14)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2014.6861219","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10
Abstract
The German power sector will face a profound change from conventional power generation to an energy system with a high share of intermittent renewable energy sources. The following analysis addresses the future transmission grid design for Germany in 2030 in a context of different renewable integration schemes. Therefore a DC load flow model is set-up, which deals with the trade-off between grid expansion and regional renewable integration. Two scenarios concerning different renewable feed-in design options are considered: curtailment of renewables only at negative prices in the height of their individual levelized costs of electricity, and curtailment at marginal costs (tending to zero). To cope with the large-scale network capacity expansion problem, Benders Decomposition and DC-load flow approximation are applied. The results show that the different renewable integration schemes have different effects on the AC grid expansions in contrast to High-Voltage-Direct-Current (HVDC) connections.