{"title":"Experiences with implementation of FTR obligations and options at PJM","authors":"X. Ma, D. Sun","doi":"10.1109/PES.2004.4632144","DOIUrl":null,"url":null,"abstract":"Summary form only given. This presentation summarizes experiences with implementation of an FTR system including obligations and options at PJM. Main topics include: a brief review of the PJM FTR market project, a description of forward and option FTRs, a discussion of the short and long term FTRs, performance challenges, and the description of the FTR auction market system","PeriodicalId":236779,"journal":{"name":"IEEE Power Engineering Society General Meeting, 2004.","volume":"151 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-06-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Power Engineering Society General Meeting, 2004.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2004.4632144","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Summary form only given. This presentation summarizes experiences with implementation of an FTR system including obligations and options at PJM. Main topics include: a brief review of the PJM FTR market project, a description of forward and option FTRs, a discussion of the short and long term FTRs, performance challenges, and the description of the FTR auction market system