{"title":"Energy Policy Act of 2005: Pseudo-Fed for Transmission Congestion","authors":"Alexander K. Obrecht","doi":"10.5195/PJEPHL.2013.43","DOIUrl":null,"url":null,"abstract":"Increasing federal involvement in the wholesale electricity market, and the ever-important emphasis on renewable energy resources, exposed the inadequacies of the existing transmission infrastructure. The Energy Policy Act of 2005 (EPAct 2005) attempted to address the transmission problems but failed to adequately consolidate federal power over transmission siting. The resulting atmosphere presents an unsustainable dichotomy in which federal involvement encourages generation dependent upon transmission access, while state control over transmission siting impedes the necessary investment and capital improvement. Despite the efforts of EPAct 2005, a coherent and effective national energy policy remains unobtainable without the ability to incentivize generation and guarantee access to transmission by facilitating its development across state lines.This note proceeds in two sections. First, the background section provides a brief history of federally mandated deregulation in the wholesale electricity market. A brief summary of EPAct 2005 then explains Congress's attempt to encourage transmission investment by allowing limited federal jurisdiction over the siting process. Second, the note analyzes the current pressures exerted on the transmission grid by renewable energy and inadequate state siting processes. The analysis then addresses the judicial interpretations of EPAct 2005 and how the United States Courts of Appeals delayed federal jurisdiction over transmission siting for the foreseeable future.","PeriodicalId":166493,"journal":{"name":"Legislation & Statutory Interpretation eJournal","volume":"88 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Legislation & Statutory Interpretation eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5195/PJEPHL.2013.43","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Increasing federal involvement in the wholesale electricity market, and the ever-important emphasis on renewable energy resources, exposed the inadequacies of the existing transmission infrastructure. The Energy Policy Act of 2005 (EPAct 2005) attempted to address the transmission problems but failed to adequately consolidate federal power over transmission siting. The resulting atmosphere presents an unsustainable dichotomy in which federal involvement encourages generation dependent upon transmission access, while state control over transmission siting impedes the necessary investment and capital improvement. Despite the efforts of EPAct 2005, a coherent and effective national energy policy remains unobtainable without the ability to incentivize generation and guarantee access to transmission by facilitating its development across state lines.This note proceeds in two sections. First, the background section provides a brief history of federally mandated deregulation in the wholesale electricity market. A brief summary of EPAct 2005 then explains Congress's attempt to encourage transmission investment by allowing limited federal jurisdiction over the siting process. Second, the note analyzes the current pressures exerted on the transmission grid by renewable energy and inadequate state siting processes. The analysis then addresses the judicial interpretations of EPAct 2005 and how the United States Courts of Appeals delayed federal jurisdiction over transmission siting for the foreseeable future.
2005年能源政策法案:输电拥塞的伪联邦
联邦政府对电力批发市场的介入越来越多,对可再生能源的重视程度也越来越高,这暴露了现有输电基础设施的不足。2005年能源政策法案(EPAct 2005)试图解决输电问题,但未能充分巩固联邦在输电选址方面的权力。由此产生的气氛呈现出一种不可持续的二分法:联邦政府的参与鼓励依赖输电接入的发电,而州政府对输电选址的控制阻碍了必要的投资和资本改善。尽管《2005年环境保护法》做出了努力,但如果不能通过促进跨州发展来激励发电和保证输电,连贯有效的国家能源政策仍然无法实现。本文分两部分进行。首先,背景部分简要介绍了联邦政府授权的批发电力市场放松管制的历史。《2005年环境保护法案》的简要概述解释了国会试图通过允许有限的联邦管辖权来鼓励输电投资。其次,该报告分析了可再生能源和不适当的状态选址过程对输电网施加的当前压力。然后分析了EPAct 2005的司法解释,以及美国上诉法院如何在可预见的未来推迟联邦对输电选址的管辖权。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信