Evaluation of Seismic Events Occurred after Filling and Drawdown of the Reservoir at Song Tranh 2 HPP in Vietnam

Q. Trinh, K. K. Panthi
{"title":"Evaluation of Seismic Events Occurred after Filling and Drawdown of the Reservoir at Song Tranh 2 HPP in Vietnam","authors":"Q. Trinh, K. K. Panthi","doi":"10.3126/HN.V15I0.11285","DOIUrl":null,"url":null,"abstract":"Reservoir-induced earthquakes are a challenging issue for hydropower, and have occurred at many sites around the world. However, each event is unique in itself and depends on the geo-tectonics and geo-hydrology of the area in which the event is situated. This article focuses on seismic events at the Song Tranh 2 hydropower project located in Quang Nam province, Vietnam. The construction of the 96 meter high Roller Compacted Concrete (RCC) dam of this project was completed in August 2011. Approximately one year after commissioning, the dam began experiencing a serious leakage problem through the dam body. In addition, a series of earthquakes occurred near the project area, and continued for several months. The high intensity and magnitude of the earthquakes caused damage to the project and promoted fear among the local people living in the downstream valley. The issues drew significant media attention and thousands of articles about this project were written within a short time. As a result, dam authorities have been subject to extreme public pressure.This paper describes the earthquake events and difficult situation that both the local population and authorities faced in its aftermath. In addition, we analyze seismic events qualitatively,using data and information on the water filling and drawdown processes. Our analysis provides an insight into these seismic events, as we reconstruct the earthquake scenarios and test a hypothesis of earthquake occurrence. Future earthquake activities are also predicted and compared. DOI: http://dx.doi.org/10.3126/hn.v15i0.11285 HYDRO Nepal Journal Journal of Water, Energy and Environment Volume: 15, 2014, July Page: 16-20","PeriodicalId":117617,"journal":{"name":"Hydro Nepal: Journal of Water, Energy and Environment","volume":"35 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-10-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydro Nepal: Journal of Water, Energy and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/HN.V15I0.11285","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

Reservoir-induced earthquakes are a challenging issue for hydropower, and have occurred at many sites around the world. However, each event is unique in itself and depends on the geo-tectonics and geo-hydrology of the area in which the event is situated. This article focuses on seismic events at the Song Tranh 2 hydropower project located in Quang Nam province, Vietnam. The construction of the 96 meter high Roller Compacted Concrete (RCC) dam of this project was completed in August 2011. Approximately one year after commissioning, the dam began experiencing a serious leakage problem through the dam body. In addition, a series of earthquakes occurred near the project area, and continued for several months. The high intensity and magnitude of the earthquakes caused damage to the project and promoted fear among the local people living in the downstream valley. The issues drew significant media attention and thousands of articles about this project were written within a short time. As a result, dam authorities have been subject to extreme public pressure.This paper describes the earthquake events and difficult situation that both the local population and authorities faced in its aftermath. In addition, we analyze seismic events qualitatively,using data and information on the water filling and drawdown processes. Our analysis provides an insight into these seismic events, as we reconstruct the earthquake scenarios and test a hypothesis of earthquake occurrence. Future earthquake activities are also predicted and compared. DOI: http://dx.doi.org/10.3126/hn.v15i0.11285 HYDRO Nepal Journal Journal of Water, Energy and Environment Volume: 15, 2014, July Page: 16-20
越南宋川2号水电站水库充放后地震事件评价
水库引发的地震对水电来说是一个具有挑战性的问题,在世界各地的许多地方都发生过。然而,每个事件本身都是独一无二的,并取决于事件所在地区的地质构造和地质水文。本文主要关注位于越南广南省的宋川2号水电项目的地震事件。该项目高96米的碾压混凝土(RCC)坝于2011年8月完工。在投入使用大约一年后,大坝开始出现严重的坝体渗漏问题。此外,在项目区附近发生了一系列地震,并持续了几个月。高强度和震级的地震对工程造成了破坏,并引起了下游山谷居民的恐惧。这些问题引起了媒体的极大关注,在很短的时间内就有成千上万篇关于这个项目的文章被写了出来。因此,大坝管理部门一直受到公众的极大压力。本文描述了地震事件以及当地居民和当局在震后所面临的困境。此外,我们利用充水和降水过程的数据和信息对地震事件进行定性分析。我们的分析提供了对这些地震事件的洞察,因为我们重建了地震场景并测试了地震发生的假设。预测和比较未来的地震活动。DOI: http://dx.doi.org/10.3126/hn.v15i0.11285 HYDRO Nepal Journal Journal of Water, Energy and Environment卷:15,2014年7月页:16-20
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信