ANALISIS KENAIKAN PLANT HEAT RATE PLTU SEBELUM PERBAIKAN BERKALA TERHADAP KONDISI TESTING KOMISIONING (Studi Kasus : PLTU XX)

K. Komarudin, Andrian Saputro, Erfiana Wahyuningsih
{"title":"ANALISIS KENAIKAN PLANT HEAT RATE PLTU SEBELUM PERBAIKAN BERKALA TERHADAP KONDISI TESTING KOMISIONING (Studi Kasus : PLTU XX)","authors":"K. Komarudin, Andrian Saputro, Erfiana Wahyuningsih","doi":"10.54378/bt.v16i1.1740","DOIUrl":null,"url":null,"abstract":"Steam power plant is a power plant which use coal as fuel to heating the water into superheated steam . The standard of efficient or not for a power plant can be seen from the value of plant heat rate. Plant heat rate is amount of energy required to generate one kWh electricity. The smallest of that is the best power plant . In general, the value of plant heat rate has increased than commisioning test after the power plant operated continously . The method used in the calculation of the steam power plant is energy balance method. Energy balance calculation method used by the standard of the American Society of Engineers Mechanichal Performance Test Code (ASME PTC). The value of plant heat rate is influenced by the value of turbine heat rate and boiler efficiency from steam power plant . Turbine heat rate is the required energy turbines obtained from heat transfer process to generate one kWh electricity, while boiler efficiency is an indicator from boiler performance of steam power plant by comparing the outputs and inputs. After calculation of plant heat rate at actual condition, the value of plant heat rate has increased than commisioning. The increrase of plant heat rate value is due to more losses which result degradation performance on the main components of the unis, such as : turbine, boiler, air heater and condenser. Therefore necessary corrective maintenance when first year inspection, so that the steam power plant can be re-optimal performance as at commisioning test.","PeriodicalId":441070,"journal":{"name":"Bina Teknika","volume":"2990 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bina Teknika","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.54378/bt.v16i1.1740","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

Steam power plant is a power plant which use coal as fuel to heating the water into superheated steam . The standard of efficient or not for a power plant can be seen from the value of plant heat rate. Plant heat rate is amount of energy required to generate one kWh electricity. The smallest of that is the best power plant . In general, the value of plant heat rate has increased than commisioning test after the power plant operated continously . The method used in the calculation of the steam power plant is energy balance method. Energy balance calculation method used by the standard of the American Society of Engineers Mechanichal Performance Test Code (ASME PTC). The value of plant heat rate is influenced by the value of turbine heat rate and boiler efficiency from steam power plant . Turbine heat rate is the required energy turbines obtained from heat transfer process to generate one kWh electricity, while boiler efficiency is an indicator from boiler performance of steam power plant by comparing the outputs and inputs. After calculation of plant heat rate at actual condition, the value of plant heat rate has increased than commisioning. The increrase of plant heat rate value is due to more losses which result degradation performance on the main components of the unis, such as : turbine, boiler, air heater and condenser. Therefore necessary corrective maintenance when first year inspection, so that the steam power plant can be re-optimal performance as at commisioning test.
pitu暖息率分析,然后周期性地改善佣金测试条件(病例研究:pitu XX)
蒸汽发电厂是以煤为燃料,把水加热成过热蒸汽的发电厂。电厂的高效与否的标准可以从电厂热率的数值上看出来。工厂热率是指生产1千瓦时电力所需的能量。其中最小的是最好的发电厂。一般情况下,电厂连续运行后,电厂热率值比调试试验值有所增加。在蒸汽动力装置的计算中采用的方法是能量平衡法。美国工程师学会机械性能测试规范(ASME PTC)的能量平衡计算方法。电厂热率的取值受汽轮机热率和锅炉效率的影响。汽轮机热率是汽轮机在换热过程中产生1千瓦时电能所需要的能量,而锅炉效率是蒸汽电厂锅炉性能通过输出和输入的比较得出的指标。经实际工况下的厂热率计算,厂热率值比调试时有所提高。电厂热率值的增加是由于机组的主要部件,如汽轮机、锅炉、空气加热器和冷凝器的损耗增加而导致性能下降。因此在第一年检修时必须进行纠正性维护,使蒸汽动力装置在调试试验时能够重新获得最佳性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信