{"title":"Proposing New UFLS Schemes to Model the Iran Grid management Co. (IGMC) Constraints Considering Three Main Aspects: Load Shedding, Frequency and Geographical Distribution","authors":"Mahdi Samadi, Ali Ghaznavi, M. Hajiabadi, I. Nikoofekr, M. Yeylaghi","doi":"10.1109/PSC49016.2019.9081497","DOIUrl":null,"url":null,"abstract":"In this paper, we have proposed some under-frequency load shedding (UFLS) schemes for implementation in the Khorasan Network. In this regard, we have suggested a new relation to determine the number of substations required for load shedding at each frequency step, using which, the guideline of IGMC is well observed for the UFLS schemes. In the analysis of the proposed schemes, after reviewing the required constraints, their features have been analyzed in terms of three basic aspects: 1.The amount of load shedding at each frequency step; 2.The frequency response and its stability after disturbance (generator or tie-line outage or sudden load increase); 3.The geographical distribution of substations in each scheme; The Khorasan grid was modeled in the DigSilent Power Factory software with all the actual information of loads and power plants as well as the required dynamic parameters to analyze the frequency of the system in the contingency. The results of this study will be highly effective and useful in the quantitative evaluation of UFLS and selecting the optimal schemes.","PeriodicalId":359817,"journal":{"name":"2019 International Power System Conference (PSC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 International Power System Conference (PSC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PSC49016.2019.9081497","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
In this paper, we have proposed some under-frequency load shedding (UFLS) schemes for implementation in the Khorasan Network. In this regard, we have suggested a new relation to determine the number of substations required for load shedding at each frequency step, using which, the guideline of IGMC is well observed for the UFLS schemes. In the analysis of the proposed schemes, after reviewing the required constraints, their features have been analyzed in terms of three basic aspects: 1.The amount of load shedding at each frequency step; 2.The frequency response and its stability after disturbance (generator or tie-line outage or sudden load increase); 3.The geographical distribution of substations in each scheme; The Khorasan grid was modeled in the DigSilent Power Factory software with all the actual information of loads and power plants as well as the required dynamic parameters to analyze the frequency of the system in the contingency. The results of this study will be highly effective and useful in the quantitative evaluation of UFLS and selecting the optimal schemes.
在本文中,我们提出了一些低频减载(UFLS)方案来实施呼罗珊网络。在这方面,我们提出了一个新的关系式来确定每个频率步长减载所需的变电站数量,使用该关系式可以很好地观察到IGMC准则对UFLS方案的影响。在对所提方案的分析中,在审查了所需要的约束条件后,从三个基本方面分析了其特征:1。各频率阶的减载量;2.扰动(发电机或联络线中断或负载突然增加)后的频率响应及其稳定性;3.各方案变电站的地理分布;在DigSilent Power Factory软件中对呼罗珊电网进行建模,并获取所有负荷和电厂的实际信息以及所需的动态参数,以分析系统在突发事件中的频率。本文的研究结果对UFLS的定量评价和优化方案的选择具有重要的参考价值。