Wind Energy Potential in Gaza Strip-Palestine state

Y. Nassar, Samer Alsadi
{"title":"Wind Energy Potential in Gaza Strip-Palestine state","authors":"Y. Nassar, Samer Alsadi","doi":"10.51646/JSESD.V7I2.73","DOIUrl":null,"url":null,"abstract":"In this study, wind speed and direction data provided by Meteoblue AG-Switzerland as hourly time-series for 16 years from 2000 to 2015 for selected three cities in Gaza Strip, are used directly to evaluate the wind energy in the three selected sites which are geographically presenting the entire Strip. Jabalia is located in the North of Gaza Strip, Deir-albalah in the Middle and Rafah in the South. The wind rose diagrams have been depicted by using WRPLOT view 7.0.0 (wind rose plots for meteorological data from Lake Environmental, 2011). The statistical analysis of the data shows that; Rafah city is the first candidate to establish a wind farm in the entire Palestinian territory. The reason that, Rafah has the highest wind energy potential than the other sites. The second reason is that Rafah is located on the border crossing to Egypt, which facilitates the transfer of machinery, experts, and reduces transport and communication expanses. In addition to low population density, which increases the economic feasibility of utilizing wind energy at this location for remote area applications. The analysis has been done for a large types of wind turbines types. Gamesa G128-4.5 WT, which is manufactured for classes I and II wind speeds with low cut-in speed, was selected for our project. The estimated annual energy is 15,962 MWh/turbine, with an average utility factor of 40.4%; to cover the shortage of 200 MW we need to 110 WTs. The required area for the wind farm is estimated to be 43 km2.","PeriodicalId":232564,"journal":{"name":"Solar Energy and Sustainable Development journal","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-02-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"23","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Solar Energy and Sustainable Development journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.51646/JSESD.V7I2.73","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 23

Abstract

In this study, wind speed and direction data provided by Meteoblue AG-Switzerland as hourly time-series for 16 years from 2000 to 2015 for selected three cities in Gaza Strip, are used directly to evaluate the wind energy in the three selected sites which are geographically presenting the entire Strip. Jabalia is located in the North of Gaza Strip, Deir-albalah in the Middle and Rafah in the South. The wind rose diagrams have been depicted by using WRPLOT view 7.0.0 (wind rose plots for meteorological data from Lake Environmental, 2011). The statistical analysis of the data shows that; Rafah city is the first candidate to establish a wind farm in the entire Palestinian territory. The reason that, Rafah has the highest wind energy potential than the other sites. The second reason is that Rafah is located on the border crossing to Egypt, which facilitates the transfer of machinery, experts, and reduces transport and communication expanses. In addition to low population density, which increases the economic feasibility of utilizing wind energy at this location for remote area applications. The analysis has been done for a large types of wind turbines types. Gamesa G128-4.5 WT, which is manufactured for classes I and II wind speeds with low cut-in speed, was selected for our project. The estimated annual energy is 15,962 MWh/turbine, with an average utility factor of 40.4%; to cover the shortage of 200 MW we need to 110 WTs. The required area for the wind farm is estimated to be 43 km2.
加沙地带-巴勒斯坦国的风能潜力
在这项研究中,由Meteoblue AG-Switzerland提供的风速和风向数据是2000年至2015年16年间加沙地带选定的三个城市的每小时时间序列,直接用于评估三个选定地点的风能,这些地点在地理上代表了整个加沙地带。Jabalia位于加沙地带北部,中部的Deir-albalah和南部的Rafah。风玫瑰图使用WRPLOT视图7.0.0绘制(2011年湖泊环境气象数据的风玫瑰图)。对数据进行统计分析表明;拉法市是在整个巴勒斯坦领土上建立风力发电场的第一个候选地。究其原因,拉法比其他地区拥有最高的风能潜力。第二个原因是拉法位于通往埃及的过境点,这有利于机械和专家的转移,并减少了运输和通信的费用。此外,人口密度低,这增加了在偏远地区利用风能的经济可行性。该分析已经完成了一种大型类型的风力涡轮机类型。我们的项目选择了Gamesa G128-4.5 WT,这是为低切入速度的I级和II级风速制造的。预计年发电量为15962兆瓦时/台,平均效用系数为40.4%;为了弥补200兆瓦的短缺,我们需要110兆瓦。风力发电场所需面积估计为43平方公里。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信