Empirical analysis of the Congestion Revenue Cycle in Europe's electricity grid

C. Duthaler, M. Finger
{"title":"Empirical analysis of the Congestion Revenue Cycle in Europe's electricity grid","authors":"C. Duthaler, M. Finger","doi":"10.1109/INFRA.2008.5439579","DOIUrl":null,"url":null,"abstract":"In the light of the ongoing electricity market integration in Europe, the debate has turned to a more regional approach of network access. Among other things, this leads to new questions with regard to the handling of congestion revenues. This paper explores the importance of a comprehensive view at the Congestion Revenue Cycle, consisting of the three stages revenue generation, revenue distribution and revenue usage. The relationship between available capacity and congestion revenue is examined and the effect of several revenue distribution keys is empirically investigated. The findings show that a revenue distribution must consider revenue generation and revenue usage to achieve sustainable results.","PeriodicalId":207041,"journal":{"name":"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)","volume":"274 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 First International Conference on Infrastructure Systems and Services: Building Networks for a Brighter Future (INFRA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/INFRA.2008.5439579","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

In the light of the ongoing electricity market integration in Europe, the debate has turned to a more regional approach of network access. Among other things, this leads to new questions with regard to the handling of congestion revenues. This paper explores the importance of a comprehensive view at the Congestion Revenue Cycle, consisting of the three stages revenue generation, revenue distribution and revenue usage. The relationship between available capacity and congestion revenue is examined and the effect of several revenue distribution keys is empirically investigated. The findings show that a revenue distribution must consider revenue generation and revenue usage to achieve sustainable results.
欧洲电网拥堵收益周期的实证分析
鉴于欧洲正在进行的电力市场整合,辩论已转向更区域性的网络接入方法。除此之外,这还导致了有关处理拥堵收入的新问题。本文探讨了在拥堵收入周期中综合观点的重要性,包括三个阶段:收入产生、收入分配和收入使用。研究了可用容量与拥堵收入之间的关系,并对几个收入分配关键的影响进行了实证研究。研究结果表明,收入分配必须考虑收入产生和收入使用,以实现可持续的结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信