Icebreaking Ore Carrier Project for Baffinland Iron Mines Corporation

G. Wilkman, Matti Arpiainen, Riku Kiili, T. Mattsson, R. Cooper, John T. Stubbs
{"title":"Icebreaking Ore Carrier Project for Baffinland Iron Mines Corporation","authors":"G. Wilkman, Matti Arpiainen, Riku Kiili, T. Mattsson, R. Cooper, John T. Stubbs","doi":"10.5957/icetech-2008-112","DOIUrl":null,"url":null,"abstract":"Baffinland Iron Mines Corporation is planning to utilize the iron deposits on the northern Baffin Island (Canada). The iron ore was discovered in the beginning of 1960ies. The mine is 100-142km from the sea shore (Milne Inlet or Steensby Inlet). The sea area from Milne Inlet and Steensby Inlet to North Atlantic is most of the year ice covered. Open water period may be only three months, from July to October.\n The operation is planned to be year-round.\n The amount of iron ore to be transported in the beginning of the production in 2014 is c. 18 million tonnes/year. The ore carriers are to be operated independently without icebreaker assistance. The ore carriers are assumed to operate at full draught both in loaded and ballast condition when operating in ice. The ship size was selected to be of main dimensions as a Dunkirkmax/Capesize vessel. There are two basic ore carrier alternative designs; The first alternative is conventional icebreaking vessel, which mainly operates by breaking ice with the bow. The second alternative is the so called Double Acting Ship (DAS). In the DAS concept the vessel is designed to operate bow first most of the time, in open water and in light ice conditions, but in severe ice conditions running astern. This paper describes the design process of the vessels including the basic requirements, operational conditions, transit simulations, model tests and the vessel designs.","PeriodicalId":262766,"journal":{"name":"Day 2 Mon, July 21, 2008","volume":"09 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-07-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Mon, July 21, 2008","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5957/icetech-2008-112","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Baffinland Iron Mines Corporation is planning to utilize the iron deposits on the northern Baffin Island (Canada). The iron ore was discovered in the beginning of 1960ies. The mine is 100-142km from the sea shore (Milne Inlet or Steensby Inlet). The sea area from Milne Inlet and Steensby Inlet to North Atlantic is most of the year ice covered. Open water period may be only three months, from July to October. The operation is planned to be year-round. The amount of iron ore to be transported in the beginning of the production in 2014 is c. 18 million tonnes/year. The ore carriers are to be operated independently without icebreaker assistance. The ore carriers are assumed to operate at full draught both in loaded and ballast condition when operating in ice. The ship size was selected to be of main dimensions as a Dunkirkmax/Capesize vessel. There are two basic ore carrier alternative designs; The first alternative is conventional icebreaking vessel, which mainly operates by breaking ice with the bow. The second alternative is the so called Double Acting Ship (DAS). In the DAS concept the vessel is designed to operate bow first most of the time, in open water and in light ice conditions, but in severe ice conditions running astern. This paper describes the design process of the vessels including the basic requirements, operational conditions, transit simulations, model tests and the vessel designs.
巴夫兰铁矿公司破冰船项目
巴芬兰铁矿公司正计划利用巴芬岛北部(加拿大)的铁矿。这个铁矿是在20世纪60年代初发现的。该矿距海岸(米尔恩湾或斯滕斯比湾)100-142公里。从米尔恩湾和斯滕斯比湾到北大西洋的海域一年中大部分时间都被冰覆盖。开放水域可能只有三个月,从七月到十月。该行动计划全年进行。2014年生产初期的铁矿石运输量约为1800万吨/年。矿石运输船将在没有破冰船协助的情况下独立作业。假定矿砂船在装载和压载状态下均以全吃水运行。船舶尺寸被选择为Dunkirkmax/好望角型船舶的主要尺寸。有两种基本的矿石运输船可供选择的设计;第一种替代方案是传统的破冰船,主要通过船首破冰来运作。第二种备选方案是所谓的双代理舰(DAS)。在DAS概念中,该船被设计为在大部分时间里首先在船头操作,在开阔水域和轻冰条件下,但在严重的冰条件下,倒车。本文介绍了该船的设计过程,包括基本要求、运行条件、航行模拟、模型试验和船舶设计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信