{"title":"On Minimizing the Makespan of a Set of Offline MapReduce Jobs","authors":"Majun He, Wenxia Guo, Houwen Huang, Bo He, Jing Wang, Wenhong Tian","doi":"10.1109/SERVICES.2018.00014","DOIUrl":null,"url":null,"abstract":"There are quite a few algorithms on minimizing the makespan of a set of offline MapReduce jobs. However, these algorithms are heuristic or suboptimal. The best-known algorithm for minimizing the makespan is 3-approximation by applying Johnson model. In this paper, we evaluate three algorithms in terms of approximation, computational complexity, stability and optimal configuration of the underline cluster for the first time.","PeriodicalId":130225,"journal":{"name":"2018 IEEE World Congress on Services (SERVICES)","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 IEEE World Congress on Services (SERVICES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SERVICES.2018.00014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
There are quite a few algorithms on minimizing the makespan of a set of offline MapReduce jobs. However, these algorithms are heuristic or suboptimal. The best-known algorithm for minimizing the makespan is 3-approximation by applying Johnson model. In this paper, we evaluate three algorithms in terms of approximation, computational complexity, stability and optimal configuration of the underline cluster for the first time.