Customization of Scrum Methodology for Outsourced E-Commerce Projects

Nayoung Hong, Junbeom Yoo, S. Cha
{"title":"Customization of Scrum Methodology for Outsourced E-Commerce Projects","authors":"Nayoung Hong, Junbeom Yoo, S. Cha","doi":"10.1109/APSEC.2010.43","DOIUrl":null,"url":null,"abstract":"This paper describes how scrum method was customized for outsourced e-commerce software projects. While the waterfall process was used in the past, outsourced projects experienced more delays and failures than the ones conducted in-house. To overcome such limitations, we decided to tailor the scrum method on three aspects: First, we produced a table that explains roles and responsibilities of project team members for every phase of the Scrum methodology. Second, we divided sprint planning into two phases, a master sprint plan and individual sprint plans. Finally, we monitored project progress based on the number of completed web pages. Application of the modified scrum method on two projects not only improved product quality but also reduced time necessary to complete the project. More than 80% of the software engineers also expressed satisfaction of the proposed approach.","PeriodicalId":161686,"journal":{"name":"2010 Asia Pacific Software Engineering Conference","volume":"71 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"21","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 Asia Pacific Software Engineering Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APSEC.2010.43","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 21

Abstract

This paper describes how scrum method was customized for outsourced e-commerce software projects. While the waterfall process was used in the past, outsourced projects experienced more delays and failures than the ones conducted in-house. To overcome such limitations, we decided to tailor the scrum method on three aspects: First, we produced a table that explains roles and responsibilities of project team members for every phase of the Scrum methodology. Second, we divided sprint planning into two phases, a master sprint plan and individual sprint plans. Finally, we monitored project progress based on the number of completed web pages. Application of the modified scrum method on two projects not only improved product quality but also reduced time necessary to complete the project. More than 80% of the software engineers also expressed satisfaction of the proposed approach.
外包电子商务项目的Scrum方法定制
本文描述了如何为外包电子商务软件项目定制scrum方法。虽然瀑布过程在过去被使用过,但外包项目比内部项目经历了更多的延迟和失败。为了克服这些限制,我们决定在三个方面调整scrum方法:首先,我们制作了一个表格,解释scrum方法的每个阶段项目团队成员的角色和职责。其次,我们将冲刺计划分为两个阶段,一个总体冲刺计划和一个单独的冲刺计划。最后,我们根据完成的网页数量来监控项目进度。在两个项目中应用改进后的scrum方法,不仅提高了产品质量,而且减少了完成项目所需的时间。超过80%的软件工程师也对所提出的方法表示满意。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信