F. Vallée, F. Vallée, J. Lobry, O. Deblecker
{"title":"Impact of wind power integration in the context of transmission systems adequacy studies with economic dispatch: Application to the Belgian case","authors":"F. Vallée, F. Vallée, J. Lobry, O. Deblecker","doi":"10.1109/ICCEP.2011.6036320","DOIUrl":null,"url":null,"abstract":"In this paper, a strategy is proposed in order to introduce in a realistic way wind generation into a HLII (bulk power system) non sequential Monte Carlo adequacy study with economic dispatch. Thanks to the implemented solution, wind generation is consequently confronted to operational constraints related to high powered thermal units, nuclear parks or thermal machines with technical minimum value. Moreover, during each simulated system state, a DC load flow is also calculated in order to evaluate reinforcements optimizing the large scale integration of wind power production. The simulation tool modified during the present work is called Scanner© and is the property of Tractebel Engineering (Gaz de France - Suez) company. Finally, in order to fully access the large offshore wind potential in the North Sea, the proposed simulation tool has been used to evaluate the onshore reinforcements required in the Belgian transmission network.","PeriodicalId":403158,"journal":{"name":"2011 International Conference on Clean Electrical Power (ICCEP)","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference on Clean Electrical Power (ICCEP)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCEP.2011.6036320","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
经济调度下输电系统充分性研究背景下风电整合的影响:比利时案例的应用
本文提出了一种将风力发电现实地引入具有经济调度的大容量电力系统非序贯蒙特卡洛充分性研究中的策略。由于实施了解决方案,风力发电因此面临与高功率热电机组、核园区或技术最小值热机相关的运行限制。此外,在每个模拟系统状态下,还计算了直流负荷潮流,以评估优化风电生产大规模集成的加固措施。在本工作中修改的仿真工具称为Scanner©,是Tractebel Engineering (Gaz de France - Suez)公司的财产。最后,为了充分利用北海的大型海上风电潜力,所提出的模拟工具已被用于评估比利时输电网络所需的陆上加固。
本文章由计算机程序翻译,如有差异,请以英文原文为准。