A Necessary and Sometimes Sufficient Condition for the Feasibility of Sets of Sporadic Hard-Deadline Tasks

T. Baker, M. Cirinei
{"title":"A Necessary and Sometimes Sufficient Condition for the Feasibility of Sets of Sporadic Hard-Deadline Tasks","authors":"T. Baker, M. Cirinei","doi":"10.1109/RTSS.2006.7","DOIUrl":null,"url":null,"abstract":"This paper describes a necessary condition for feasibility of scheduling a set of sporadic hard-deadline tasks on identical multiprocessor platforms, which is also a sufficient condition if there is only a single processor. The key contribution is the characterization of the maximum, over all time intervals of a given length, of the amount of computation that must be completed to meet all deadlines, and a method of computing this function efficiently to any desired degree of accuracy. Empirical data are provided to verify that the new infeasibility test can be computed efficiently and is an improvement over previously known checks for infeasibility","PeriodicalId":353932,"journal":{"name":"2006 27th IEEE International Real-Time Systems Symposium (RTSS'06)","volume":"59 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"58","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2006 27th IEEE International Real-Time Systems Symposium (RTSS'06)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RTSS.2006.7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 58

Abstract

This paper describes a necessary condition for feasibility of scheduling a set of sporadic hard-deadline tasks on identical multiprocessor platforms, which is also a sufficient condition if there is only a single processor. The key contribution is the characterization of the maximum, over all time intervals of a given length, of the amount of computation that must be completed to meet all deadlines, and a method of computing this function efficiently to any desired degree of accuracy. Empirical data are provided to verify that the new infeasibility test can be computed efficiently and is an improvement over previously known checks for infeasibility
零星硬期限任务集可行性的一个必要有时充分条件
本文描述了在同一多处理机平台上调度一组零星的硬截止日期任务的可行性的必要条件,也是单处理机平台上调度一组零星硬截止日期任务的可行性的充分条件。关键的贡献是描述了在给定长度的所有时间间隔内,为满足所有截止日期而必须完成的计算量的最大值,以及有效地计算该函数以达到所需精度的方法。提供的经验数据验证了新的不可行性检验可以有效地计算,并且是对以前已知的不可行性检验的改进
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信