{"title":"Issues overcome in the design and application of IEC 61850-compliant substation automation systems","authors":"Shinji Matsuda, Y. Watabe, Ilwan Izani Asrizal, S. Katayama, Koichi Okuno, Ken Kasuga","doi":"10.1109/APAP.2011.6180408","DOIUrl":null,"url":null,"abstract":"This paper provides an outline of the IEC 61850 standard, it proposes a configuration policy for IEC 61850-compliant SASs and describes their detailed system configuration. This paper also raises issues to be overcome with regard to the practical use of IEC 61850 and describes methods to ensure that interoperability is maintained for multivendor solutions. In addition, this paper explains the technologies and knowledge required to construct an interoperable system with IEC 61850 learnt from our experience of IEC 61850-compliant verification tests and actual projects in Southeast Asia and the Middle East. This paper also clearly describes appropriate definitions for logical nodes, communication services, optional signal settings and allocation of functions to physical devices that must be carefully considered by the system integrator.","PeriodicalId":435652,"journal":{"name":"2011 International Conference on Advanced Power System Automation and Protection","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Conference on Advanced Power System Automation and Protection","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APAP.2011.6180408","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

Abstract

This paper provides an outline of the IEC 61850 standard, it proposes a configuration policy for IEC 61850-compliant SASs and describes their detailed system configuration. This paper also raises issues to be overcome with regard to the practical use of IEC 61850 and describes methods to ensure that interoperability is maintained for multivendor solutions. In addition, this paper explains the technologies and knowledge required to construct an interoperable system with IEC 61850 learnt from our experience of IEC 61850-compliant verification tests and actual projects in Southeast Asia and the Middle East. This paper also clearly describes appropriate definitions for logical nodes, communication services, optional signal settings and allocation of functions to physical devices that must be carefully considered by the system integrator.
符合IEC 61850标准的变电站自动化系统在设计和应用中所克服的问题
本文概述了IEC 61850标准,提出了符合IEC 61850标准的SASs的配置策略,并详细描述了SASs的系统配置。本文还提出了关于实际使用IEC 61850需要克服的问题,并描述了确保多供应商解决方案保持互操作性的方法。此外,本文还从我们在东南亚和中东进行符合IEC 61850标准的验证测试和实际项目的经验中,阐述了构建符合IEC 61850标准的可互操作系统所需的技术和知识。本文还清楚地描述了逻辑节点、通信服务、可选信号设置和物理设备功能分配的适当定义,这些都是系统集成商必须仔细考虑的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信