S. Valeev, N. Kondratyeva, R. Karimov, M. Verkhoturov, Timur Islamgulov, L. Shekhtman
{"title":"Production planning in a construction company as an element of Gartner enterprise architecture","authors":"S. Valeev, N. Kondratyeva, R. Karimov, M. Verkhoturov, Timur Islamgulov, L. Shekhtman","doi":"10.47350/iccs-de.2021.15","DOIUrl":null,"url":null,"abstract":"The problem of production planning as an element of Gartner enterprise architecture in a distributed organizational and technical system is considered on the example of a construction company of medium and large scale. Mathematical models for planning organizational and technical resources in a distributed system as elements of patterns are discussed. In the development of the information and application layers, field-proven solutions can be used as patterns. The approach to the organization of business processes of a construction company that allows solving the problem of optimal scheduling of construction works while simultaneously executing a number of projects by the company and, thus, increasing the management efficiency of a geographically distributed enterprise is considered. The enterprise architecture as a unified information environment for managers of a construction company, site managers, supply engineers, designers, and estimates is discussed.","PeriodicalId":210887,"journal":{"name":"International Workshop on Information, Computation, and Control Systems for Distributed Environments","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Workshop on Information, Computation, and Control Systems for Distributed Environments","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47350/iccs-de.2021.15","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The problem of production planning as an element of Gartner enterprise architecture in a distributed organizational and technical system is considered on the example of a construction company of medium and large scale. Mathematical models for planning organizational and technical resources in a distributed system as elements of patterns are discussed. In the development of the information and application layers, field-proven solutions can be used as patterns. The approach to the organization of business processes of a construction company that allows solving the problem of optimal scheduling of construction works while simultaneously executing a number of projects by the company and, thus, increasing the management efficiency of a geographically distributed enterprise is considered. The enterprise architecture as a unified information environment for managers of a construction company, site managers, supply engineers, designers, and estimates is discussed.