The Cost Benefit Analysis on the Swan River Flood Management and Integrated Land Development Project - Phase I & Phase II: Stage I

S. Rajendran
{"title":"The Cost Benefit Analysis on the Swan River Flood Management and Integrated Land Development Project - Phase I & Phase II: Stage I","authors":"S. Rajendran","doi":"10.2139/ssrn.1152238","DOIUrl":null,"url":null,"abstract":"The Economic Cost Benefit Analysis (ECBA) is a method used by Japan Bank of International Cooperation to measure the economic efficiency of proposed policy changes for Swan River Flood Management and Integrated Land Development Project (SRFM & ILDP). It includes Phase I and Phase II (Part) namely stage I. The paper concludes that, Phase I is economically viable project in the long run, but the Phase II, economically not viable project in the long run.","PeriodicalId":219371,"journal":{"name":"SEIN Environmental Impacts of Business eJournal","volume":"89 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SEIN Environmental Impacts of Business eJournal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.1152238","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Economic Cost Benefit Analysis (ECBA) is a method used by Japan Bank of International Cooperation to measure the economic efficiency of proposed policy changes for Swan River Flood Management and Integrated Land Development Project (SRFM & ILDP). It includes Phase I and Phase II (Part) namely stage I. The paper concludes that, Phase I is economically viable project in the long run, but the Phase II, economically not viable project in the long run.
天鹅河防洪及土地综合开发项目一期及二期的成本效益分析
经济成本效益分析(ECBA)是日本国际合作银行用于衡量天鹅河洪水管理和土地综合开发项目(SRFM & ILDP)拟议政策变化的经济效率的方法。它包括一期和二期(部分)即第一阶段。本文得出结论,从长远来看,一期是经济上可行的项目,而从长远来看,二期是经济上不可行的项目。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信