The joint policy of the CBM and inventory-supply policy for the electronical multi-part system

Huayang Deng, Q. Shi
{"title":"The joint policy of the CBM and inventory-supply policy for the electronical multi-part system","authors":"Huayang Deng, Q. Shi","doi":"10.1109/MLISE54096.2021.00094","DOIUrl":null,"url":null,"abstract":"This paper focuses on the joint policy of the CBM (Condition-based Maintenance) and inventory-supply policy for the electronical multi-part system. The CBM policy based on the Wiener-process RUL prediction method was built for the multiple parts. Considering the characteristic of the CBM, we decided the (s, S) policy and combined with the multi-echelon supply policy to build the multi-period joint model. This is based step to the joint optimization.","PeriodicalId":430495,"journal":{"name":"2021 International Conference on Machine Learning and Intelligent Systems Engineering (MLISE)","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 International Conference on Machine Learning and Intelligent Systems Engineering (MLISE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MLISE54096.2021.00094","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper focuses on the joint policy of the CBM (Condition-based Maintenance) and inventory-supply policy for the electronical multi-part system. The CBM policy based on the Wiener-process RUL prediction method was built for the multiple parts. Considering the characteristic of the CBM, we decided the (s, S) policy and combined with the multi-echelon supply policy to build the multi-period joint model. This is based step to the joint optimization.
电子多部件系统中CBM与库存供应政策的联合政策
研究了电子多部件系统的状态维护与库存供应联合策略。建立了基于Wiener-process RUL预测方法的多部件CBM策略。考虑煤层气的特点,确定了(s, s)策略,并结合多级供给策略构建了多时期联合模型。这是实现关节优化的基础步骤。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书