Bayesian Method for Finding True Change Point when a Control Chart is used

Esmail Dehghan Monfared, Fazlollah Lak
{"title":"Bayesian Method for Finding True Change Point when a Control Chart is used","authors":"Esmail Dehghan Monfared, Fazlollah Lak","doi":"10.18869/acadpub.jsri.13.1.6","DOIUrl":null,"url":null,"abstract":"The process personnel always seek the opportunity to improve the processes. One of the essential steps for process improvement is to quickly find the starting time or the change point of a process disturbance. To do this, after a control chart triggers an out-of-control signal, an order of points in time (known as a plan) should be identified such that if the process examined sequentially at them, the true change point is detected as soon as possible. A typical method is to start the examination of the process from the signal time of the control chart and proceed to neighbouring points. In this paper, we establish a Bayesian method to solve this problem, i.e. to find a plan for examining the process sequentially such that it minimizes the Bayes risk among all other possible plans. At last, our proposed Bayes method is applied to a normal process, and compared to a typical method which is usually used to find the true change point through a series of simulations.","PeriodicalId":422124,"journal":{"name":"Journal of Statistical Research of Iran","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-09-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Statistical Research of Iran","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18869/acadpub.jsri.13.1.6","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The process personnel always seek the opportunity to improve the processes. One of the essential steps for process improvement is to quickly find the starting time or the change point of a process disturbance. To do this, after a control chart triggers an out-of-control signal, an order of points in time (known as a plan) should be identified such that if the process examined sequentially at them, the true change point is detected as soon as possible. A typical method is to start the examination of the process from the signal time of the control chart and proceed to neighbouring points. In this paper, we establish a Bayesian method to solve this problem, i.e. to find a plan for examining the process sequentially such that it minimizes the Bayes risk among all other possible plans. At last, our proposed Bayes method is applied to a normal process, and compared to a typical method which is usually used to find the true change point through a series of simulations.
使用控制图时寻找真正变化点的贝叶斯方法
过程人员总是寻求机会来改进过程。过程改进的关键步骤之一是快速找到过程扰动的起始时间或变化点。要做到这一点,在控制图触发失控信号后,应该确定时间点的顺序(称为计划),以便如果在它们上依次检查过程,则可以尽快检测到真正的变化点。一种典型的方法是从控制图的信号时间开始对过程进行检查,并继续到邻近的点。在本文中,我们建立了一个贝叶斯方法来解决这个问题,即在所有可能的计划中找到一个顺序检查过程的计划,使贝叶斯风险最小化。最后,将本文提出的贝叶斯方法应用于一个正常过程,并与通常通过一系列模拟来寻找真实变化点的典型方法进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信