{"title":"The Independent: A Case Study on Delivering the Architect’s Vision with an Economical Concrete High-Rise","authors":"R. Heeringa, K. Swanson","doi":"10.1061/9780784482223.002","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":206558,"journal":{"name":"Structures Congress 2019","volume":"51 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Structures Congress 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1061/9780784482223.002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}