The EUR Assessment Process and Highlights of the Compliance Analysis for the EU-APR Standard Design

C. Declercq, A. Ballard, G. Ferraro, Anicet Touré
{"title":"The EUR Assessment Process and Highlights of the Compliance Analysis for the EU-APR Standard Design","authors":"C. Declercq, A. Ballard, G. Ferraro, Anicet Touré","doi":"10.1115/ICONE26-81889","DOIUrl":null,"url":null,"abstract":"The EU-APR standard design is a two-loop pressurised water reactor of the range of 1400MWe, developed by Korean Hydro & Nuclear Power (KHNP) from the Korean APR1400 reference plant. It is the objective of the EU-APR to comply with the current main European regulatory and utility requirements for safe and competitive LWR NPPs. A full assessment of the EU-APR against the European Utility Requirements (EUR) can therefore be regarded as an important step in its introduction to the European market.\n KHNP’s request to assess its EU-APR standard design was granted by the EUR Organisation and in autumn of 2015, a two-year assessment process started, during which the EU-APR was assessed against the twenty chapters of the EUR Document Volume 2, encompassing over four thousand individual requirements having in view principally NPP safety and performance.\n The EU-APR standard design was assessed against each single requirement by experts of the appropriate discipline from within the EUR member companies. The resultant assessment reports were reviewed by the Coordination Group (working level team) and then validated by the EUR Administration Group and EUR Steering Committee. The syntheses of the requirement-by-requirement assessments per chapter were collected in the principal project output: the EU-APR dedicated subset of EUR Document Volume 3. This Volume 3 subset (Subset I) also contains a technical description of the plant, issued by KHNP and reviewed by the EUR organisation. Furthermore, it explains the assessment process and highlights the main assessment results. Volume 3 Subset I was approved by the EUR Steering Committee in September 2017.\n The EU-APR standard design was found to be fully compliant for a majority (almost 90%) of all requirements applicable in this assessment. Furthermore, the EU-APR was found to be compliant with the objectives of an additional 6% of the investigated requirements. The EU-APR standard design can be considered to be in the late basic design phase. Nonetheless, the portion of requirements which were not assessable is very low (below 3%), explained by the abundant availability of reference plant (detailed design) documentation, which often helped demonstrate by means of extrapolatable examples KHNP’s adherence to design principles established for the EU-APR. In total, less than 1% of assessed requirements were found to be non-compliant. The main non-compliances relate to choices of design principles and analysis methods that are explicitly different from those stipulated by EUR, and to the relatively low level of development of reactor core and fuel studies to demonstrate operational nuclear plant manoeuvrability and fuel cycle optimisation in view of safety margins and economics.","PeriodicalId":354697,"journal":{"name":"Volume 5: Advanced Reactors and Fusion Technologies; Codes, Standards, Licensing, and Regulatory Issues","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-07-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Volume 5: Advanced Reactors and Fusion Technologies; Codes, Standards, Licensing, and Regulatory Issues","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1115/ICONE26-81889","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The EU-APR standard design is a two-loop pressurised water reactor of the range of 1400MWe, developed by Korean Hydro & Nuclear Power (KHNP) from the Korean APR1400 reference plant. It is the objective of the EU-APR to comply with the current main European regulatory and utility requirements for safe and competitive LWR NPPs. A full assessment of the EU-APR against the European Utility Requirements (EUR) can therefore be regarded as an important step in its introduction to the European market. KHNP’s request to assess its EU-APR standard design was granted by the EUR Organisation and in autumn of 2015, a two-year assessment process started, during which the EU-APR was assessed against the twenty chapters of the EUR Document Volume 2, encompassing over four thousand individual requirements having in view principally NPP safety and performance. The EU-APR standard design was assessed against each single requirement by experts of the appropriate discipline from within the EUR member companies. The resultant assessment reports were reviewed by the Coordination Group (working level team) and then validated by the EUR Administration Group and EUR Steering Committee. The syntheses of the requirement-by-requirement assessments per chapter were collected in the principal project output: the EU-APR dedicated subset of EUR Document Volume 3. This Volume 3 subset (Subset I) also contains a technical description of the plant, issued by KHNP and reviewed by the EUR organisation. Furthermore, it explains the assessment process and highlights the main assessment results. Volume 3 Subset I was approved by the EUR Steering Committee in September 2017. The EU-APR standard design was found to be fully compliant for a majority (almost 90%) of all requirements applicable in this assessment. Furthermore, the EU-APR was found to be compliant with the objectives of an additional 6% of the investigated requirements. The EU-APR standard design can be considered to be in the late basic design phase. Nonetheless, the portion of requirements which were not assessable is very low (below 3%), explained by the abundant availability of reference plant (detailed design) documentation, which often helped demonstrate by means of extrapolatable examples KHNP’s adherence to design principles established for the EU-APR. In total, less than 1% of assessed requirements were found to be non-compliant. The main non-compliances relate to choices of design principles and analysis methods that are explicitly different from those stipulated by EUR, and to the relatively low level of development of reactor core and fuel studies to demonstrate operational nuclear plant manoeuvrability and fuel cycle optimisation in view of safety margins and economics.
EU-APR标准设计的EUR评估过程及合规性分析要点
欧盟- apr标准设计是一个1400MWe范围的双回路压水反应堆,由韩国水电和核电(KHNP)在韩国APR1400参考电厂的基础上开发。欧盟- apr的目标是遵守目前主要的欧洲法规和对安全和有竞争力的轻水堆核电站的公用事业要求。因此,根据欧洲公用事业要求(EUR)对EU-APR进行全面评估可以被视为将其引入欧洲市场的重要一步。KHNP评估其EU-APR标准设计的请求得到了欧盟组织的批准,并于2015年秋季开始了为期两年的评估过程,在此期间,欧盟- apr根据欧盟文件第2卷的二十个章节进行了评估,其中包括4000多个主要考虑核电厂安全和性能的单独要求。欧盟- apr标准设计由欧盟成员公司的相关专业专家根据每一项要求进行评估。最终的评估报告由协调小组(工作级别小组)审查,然后由欧元管理小组和欧元指导委员会验证。每章逐个需求评估的综合收集在主要项目输出中:EUR文件卷3的EU-APR专用子集。第3卷子集(子集I)还包含由KHNP发布并由EUR组织审查的工厂技术描述。并对评估过程进行了说明,重点介绍了主要的评估结果。卷3子集I于2017年9月由欧元指导委员会批准。发现EU-APR标准设计完全符合本次评估中适用的大多数(几乎90%)要求。此外,欧盟- apr被发现符合额外6%的调查要求的目标。EU-APR标准设计可以被认为处于后期基本设计阶段。尽管如此,无法评估的部分需求非常低(低于3%),这是因为参考电厂(详细设计)文件的大量可用性,这些文件通常有助于通过可推断的例子来证明KHNP遵守了为EU-APR建立的设计原则。总的来说,不到1%的评估需求被发现是不合规的。主要的不合规涉及设计原则和分析方法的选择,这些原则和分析方法与欧盟规定的明显不同,以及相对较低的反应堆堆芯和燃料研究的发展水平,以证明核电厂的可操作性和燃料循环优化的安全边际和经济性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信