Leandro Barretiri, Bruno S. Gonçalves, R. M. Lima, J. Dinis-Carvalho
{"title":"Prioritizing Internal Production on MRI Waiting List Management: An Optimization Model","authors":"Leandro Barretiri, Bruno S. Gonçalves, R. M. Lima, J. Dinis-Carvalho","doi":"10.1007/978-3-030-78170-5_7","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":398072,"journal":{"name":"Innovations in Industrial Engineering","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-06-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Innovations in Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1007/978-3-030-78170-5_7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}