ANALYSIS OF PROJECT TIME AND COST CONTROL WITH CPM, PERT AND CRASHING PROJECT METHODS IN SHOP BUILDING PROJECTS AT CV. MENTARI PERMAI

Rosalinda Rosalinda, Nizmah Nizmah, Suko Ari R, M. Makmur, Dian Rarasanti
{"title":"ANALYSIS OF PROJECT TIME AND COST CONTROL WITH CPM, PERT AND CRASHING PROJECT METHODS IN SHOP BUILDING PROJECTS AT CV. MENTARI PERMAI","authors":"Rosalinda Rosalinda, Nizmah Nizmah, Suko Ari R, M. Makmur, Dian Rarasanti","doi":"10.37481/sjr.v6i1.622","DOIUrl":null,"url":null,"abstract":"Delays in completing the Kelapa Dua shop-house construction project at CV. Mentari permai is a problem that often arises and affects the overall project work. The purpose of this research is to determine the critical path, calculate the costs incurred in the construction of the Kelapa Dua shop-house construction project with the duration of the initial and accelerated work and calculate the percentage of achievement of the shop construction project at CV. Mutia Enchantment of Nature. To overcome these delays, several control methods are used in project management. The methods used in this research are the Critical Path Method, PERT (Program Evaluation and Review Technique) and the Crashing Project. The results of the CPM planning method analysis obtained the project completion time for 91 days from the initial duration of 154 days. Whereas in reality the CPM method, the project completion time is 101 days from the initial duration of 167 days. In the PERT method, the project completion time is 107 days from a duration of 181 days with a probability of completion of 0.62%. And in the crashing project there is an acceleration of the completion duration for 9 days with an increase in costs of Rp. 26,545,194 and a total cost of Rp. 506,613,766.","PeriodicalId":297520,"journal":{"name":"SCIENTIFIC JOURNAL OF REFLECTION : Economic, Accounting, Management and Business","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"SCIENTIFIC JOURNAL OF REFLECTION : Economic, Accounting, Management and Business","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37481/sjr.v6i1.622","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Delays in completing the Kelapa Dua shop-house construction project at CV. Mentari permai is a problem that often arises and affects the overall project work. The purpose of this research is to determine the critical path, calculate the costs incurred in the construction of the Kelapa Dua shop-house construction project with the duration of the initial and accelerated work and calculate the percentage of achievement of the shop construction project at CV. Mutia Enchantment of Nature. To overcome these delays, several control methods are used in project management. The methods used in this research are the Critical Path Method, PERT (Program Evaluation and Review Technique) and the Crashing Project. The results of the CPM planning method analysis obtained the project completion time for 91 days from the initial duration of 154 days. Whereas in reality the CPM method, the project completion time is 101 days from the initial duration of 167 days. In the PERT method, the project completion time is 107 days from a duration of 181 days with a probability of completion of 0.62%. And in the crashing project there is an acceleration of the completion duration for 9 days with an increase in costs of Rp. 26,545,194 and a total cost of Rp. 506,613,766.
运用cpm、pert和崩溃项目方法分析cv车间建设项目的项目时间和成本控制。MENTARI PERMAI
延迟完成CV的Kelapa Dua店屋建筑项目。永久性思维是一个经常出现并影响整个项目工作的问题。本研究的目的是确定关键路径,计算克拉帕杜瓦店屋建设项目的建设成本与初始工作和加速工作的持续时间,并计算在CV下店屋建设项目的成就百分比。大自然的穆提亚魔法。为了克服这些延迟,在项目管理中使用了几种控制方法。本研究使用的方法有关键路径法、PERT (Program Evaluation and Review Technique)和崩溃项目法。CPM计划方法分析的结果使项目完成时间由最初的154天缩短为91天。而在实际的CPM方法中,项目完成时间从最初的167天缩短到101天。在PERT方法中,项目完成时间为181天中的107天,完成概率为0.62%。在崩溃的项目中,完工时间加快了9天,成本增加了26,545,194卢比,总成本为506,613,766卢比。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信