Modeling of liquid unloading using coiled tubing in horizontal gas wells

S. Madani, S. Sokhoshko
{"title":"Modeling of liquid unloading using coiled tubing in horizontal gas wells","authors":"S. Madani, S. Sokhoshko","doi":"10.31660/0445-0108-2022-4-103-118","DOIUrl":null,"url":null,"abstract":"This article studies the flow simulation for liquid unloading using coiled tubing in horizontal gas wells. A semianalytical reservoir model, coupled with a wellbore model under nonisothermal, steady state conditions is used to calculate the distribution of gas velocity along the wellbore. The coupled model takes into account the effect of the wellbore trajectory type on the well performance. The minimum gas velocity for liquid removal is calculated using a model adapted for horizontal gas wells. An algorithm has been presented to estimate the well performance and the liquid unloading for different CT diameters, at various wellbore positions. The simulation results showed that the installation of 53.51 mm or 65.1 mm diameter coiled tubing at the toe ensure a good liquid unloading and optimum well performance.","PeriodicalId":240239,"journal":{"name":"Oil and Gas Studies","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Oil and Gas Studies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31660/0445-0108-2022-4-103-118","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This article studies the flow simulation for liquid unloading using coiled tubing in horizontal gas wells. A semianalytical reservoir model, coupled with a wellbore model under nonisothermal, steady state conditions is used to calculate the distribution of gas velocity along the wellbore. The coupled model takes into account the effect of the wellbore trajectory type on the well performance. The minimum gas velocity for liquid removal is calculated using a model adapted for horizontal gas wells. An algorithm has been presented to estimate the well performance and the liquid unloading for different CT diameters, at various wellbore positions. The simulation results showed that the installation of 53.51 mm or 65.1 mm diameter coiled tubing at the toe ensure a good liquid unloading and optimum well performance.
水平井连续油管卸液建模
研究了水平井连续油管卸液过程的流动模拟。采用半解析油藏模型,结合非等温稳态条件下的井筒模型,计算了沿井筒的气速分布。耦合模型考虑了井眼轨迹类型对井眼动态的影响。采用适用于水平气井的模型,计算了除液的最小气速。提出了一种算法来估计不同连续油管直径、不同井眼位置的井况和卸液量。仿真结果表明,在趾部分别安装53.51 mm和65.1 mm直径的连续油管,可以保证良好的排液效果和最佳的井效。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信