{"title":"Multi-link-speed network topology design","authors":"Pao-Chi Chang, P. Kermani, A. Kershenbaum","doi":"10.1109/PCCC.1992.200550","DOIUrl":null,"url":null,"abstract":"The authors consider the problem of selecting a link topology and sizing the link given a point-to-point traffic matrix and a cost matrix. Different speed links are permitted in the topology. An algorithm is presented for the solution to this problem, and its performance, both in terms of running time and the quality of the networks produced, is compared with that of an algorithm which only considers a single speed link. The new algorithm shows significant improvement, reducing cost by as much as 6% while increasing running time by only a constant factor.<<ETX>>","PeriodicalId":250212,"journal":{"name":"Eleventh Annual International Phoenix Conference on Computers and Communication [1992 Conference Proceedings]","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1992-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eleventh Annual International Phoenix Conference on Computers and Communication [1992 Conference Proceedings]","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCCC.1992.200550","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
The authors consider the problem of selecting a link topology and sizing the link given a point-to-point traffic matrix and a cost matrix. Different speed links are permitted in the topology. An algorithm is presented for the solution to this problem, and its performance, both in terms of running time and the quality of the networks produced, is compared with that of an algorithm which only considers a single speed link. The new algorithm shows significant improvement, reducing cost by as much as 6% while increasing running time by only a constant factor.<>