Settlement of Compensation for Land Affected by the Solo-Yogyakarta Toll Road Construction Project at the Klaten District Court

Marisa Kurnianingsih, Alfath Sartanto, Anindhita Nurfaatin Sukirman
{"title":"Settlement of Compensation for Land Affected by the Solo-Yogyakarta Toll Road Construction Project at the Klaten District Court","authors":"Marisa Kurnianingsih, Alfath Sartanto, Anindhita Nurfaatin Sukirman","doi":"10.53017/ujsah.154","DOIUrl":null,"url":null,"abstract":"National strategic projects that are being intensively carried out by the government do not escape the emergence of disputes or disputes. This study raises the case of compensation due to the construction of expressway infrastructure or the Solo-Yogyakarta toll road, precisely in the Klaten area, which is experiencing problems, one of which is the determination of the compensation value for the affected community. The matter was brought to trial at the Klaten District Court with a fast-paced trial process carried out by the Panel of Judges. This research was structured using the juridical-empirical method. This study will describe the settlement of compensation for land affected by the Solo-Yogyakarta toll road at the Klaten District Court and explore facts to find out the obstacles experienced from the perspective of the applicant in the settlement of compensation for land affected by the Solo-Yogyakarta toll road.","PeriodicalId":315613,"journal":{"name":"Urecol Journal. Part H: Social, Art, and Humanities","volume":"98 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Urecol Journal. Part H: Social, Art, and Humanities","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.53017/ujsah.154","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

National strategic projects that are being intensively carried out by the government do not escape the emergence of disputes or disputes. This study raises the case of compensation due to the construction of expressway infrastructure or the Solo-Yogyakarta toll road, precisely in the Klaten area, which is experiencing problems, one of which is the determination of the compensation value for the affected community. The matter was brought to trial at the Klaten District Court with a fast-paced trial process carried out by the Panel of Judges. This research was structured using the juridical-empirical method. This study will describe the settlement of compensation for land affected by the Solo-Yogyakarta toll road at the Klaten District Court and explore facts to find out the obstacles experienced from the perspective of the applicant in the settlement of compensation for land affected by the Solo-Yogyakarta toll road.
索罗-日惹收费公路建设项目影响土地补偿在克拉丹地区法院的解决
政府正在集中实施的国家战略项目,难免会出现争议或纠纷。本研究提出了由于高速公路基础设施或索罗-日惹收费公路的建设而获得补偿的案例,正是在Klaten地区,该地区正在遇到问题,其中之一是确定受影响社区的补偿价值。该案在克拉滕地区法院进行了审判,由法官小组进行了快节奏的审判程序。本研究采用司法-实证方法。本研究将在Klaten地区法院描述Solo-Yogyakarta收费公路影响的土地补偿的解决,并从申请人的角度探索事实,找出解决Solo-Yogyakarta收费公路影响的土地补偿所经历的障碍。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信