{"title":"Evaluation of Powerhouse Cavern for the SachKhas Hydroelectric Project in Himachal, India","authors":"A. Rathore, K. K. Panthi","doi":"10.3126/HN.V20I0.16485","DOIUrl":null,"url":null,"abstract":"Evaluation of an underground powerhouse cavern’s stability is a challenging task and needs to be carried out carefully by taking care of its location, orientation and dimensioning. This article deals with the stability evaluation of a large underground powerhouse cavern, which is located at the toe of the valley side slope where the depth varies between 59m (minimum) and 70m (maximum). The planned powerhouse cavern has a dimension consisting 130m length, 23m wide and 48 m high. The manuscript evaluates the extent of pre-construction phase engineering geological investigations of the project, discusses on the selection of input parameters and carries out assessment on the displacement conditions at the cavern and also assesses the extent of yielded zone at the toe slope. Finally, recommendations are suggested on the location and orientation of the powerhouse cavern, uncertainties involved in numerical analysis and boundary conditions for 2D and 3D models under gravitational field stress. HYDRO Nepal Journal Journal of Water Energy and Environment Issue: 20 Page: 23-30","PeriodicalId":117617,"journal":{"name":"Hydro Nepal: Journal of Water, Energy and Environment","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-01-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Hydro Nepal: Journal of Water, Energy and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/HN.V20I0.16485","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Evaluation of an underground powerhouse cavern’s stability is a challenging task and needs to be carried out carefully by taking care of its location, orientation and dimensioning. This article deals with the stability evaluation of a large underground powerhouse cavern, which is located at the toe of the valley side slope where the depth varies between 59m (minimum) and 70m (maximum). The planned powerhouse cavern has a dimension consisting 130m length, 23m wide and 48 m high. The manuscript evaluates the extent of pre-construction phase engineering geological investigations of the project, discusses on the selection of input parameters and carries out assessment on the displacement conditions at the cavern and also assesses the extent of yielded zone at the toe slope. Finally, recommendations are suggested on the location and orientation of the powerhouse cavern, uncertainties involved in numerical analysis and boundary conditions for 2D and 3D models under gravitational field stress. HYDRO Nepal Journal Journal of Water Energy and Environment Issue: 20 Page: 23-30
印度喜马偕尔邦SachKhas水电工程厂房洞室评价
地下厂房洞室的稳定性评估是一项具有挑战性的任务,需要仔细考虑其位置、方向和尺寸。本文对某大型地下厂房洞室的稳定性进行了评价,该洞室位于山谷边坡脚端,最小深度为59m,最大深度为70m。规划的厂房洞穴尺寸为130米长,23米宽,48米高。本文对该工程的施工前期工程地质调查程度进行了评价,对输入参数的选择进行了讨论,对洞室的位移条件进行了评价,并对坡脚处的屈服带进行了评价。最后,对引力场应力作用下厂房洞室的位置和方向、数值分析中的不确定性以及二维和三维模型的边界条件提出了建议。水电尼泊尔杂志水、能源和环境杂志第20期,第23-30页
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信