Supply Management by Remanufacturing Company of Mining Equipment

Marlith Roman-Rios, Mitshel Serratti-Ramos, Fernando Maradiegue-Tuesta, J. Alvarez-Merino
{"title":"Supply Management by Remanufacturing Company of Mining Equipment","authors":"Marlith Roman-Rios, Mitshel Serratti-Ramos, Fernando Maradiegue-Tuesta, J. Alvarez-Merino","doi":"10.1109/IEEM44572.2019.8978866","DOIUrl":null,"url":null,"abstract":"The proposed supply management model is based, firstly, on realizing a Kraljic matrix to obtain a purchasing strategy, and then followed by the homologation of suppliers who are mainly willing to work with an inventory managed by suppliers (VMI) system. The process aims to reduce the delay time in the acquisition of R1600 loader parts so as to meet the customer in 52 days, the frame established by the company under study in reference to the average of 45 days as the sector standard for the same item.","PeriodicalId":255418,"journal":{"name":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2019-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM44572.2019.8978866","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The proposed supply management model is based, firstly, on realizing a Kraljic matrix to obtain a purchasing strategy, and then followed by the homologation of suppliers who are mainly willing to work with an inventory managed by suppliers (VMI) system. The process aims to reduce the delay time in the acquisition of R1600 loader parts so as to meet the customer in 52 days, the frame established by the company under study in reference to the average of 45 days as the sector standard for the same item.
矿山设备再制造企业的供应管理
提出的供应管理模型首先基于Kraljic矩阵实现采购策略,然后通过供应商库存管理(VMI)系统对主要愿意工作的供应商进行认证。该流程旨在减少R1600装载机零件采购的延迟时间,以参考同类产品平均45天的行业标准,在52天内满足客户的要求。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信