A discussion of the financial valuation of transmission line assets and asset renewal projects

Kings Wong
{"title":"A discussion of the financial valuation of transmission line assets and asset renewal projects","authors":"Kings Wong","doi":"10.1109/EPEC.2015.7379951","DOIUrl":null,"url":null,"abstract":"In many power transmission utility companies in North America, there is a large number of transmission circuits that are approaching their physical end-of-life and will require their outright replacement within the next five to ten years. With limited available resources, power utility companies need to be able to properly prioritize their re-investments into an aging network.[1] This paper discusses, the complexities involved in the financial valuation of existing transmission line assets and in particular, summarizes the various methods that are used for determining the financial benefits or costs associated with the particular transmission line asset renewal project. The financial valuation of the transmission line asset and asset renewal projects are essential part of the process to prioritize reinvestments into the ageing transmission infrastructure.","PeriodicalId":231255,"journal":{"name":"2015 IEEE Electrical Power and Energy Conference (EPEC)","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE Electrical Power and Energy Conference (EPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPEC.2015.7379951","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In many power transmission utility companies in North America, there is a large number of transmission circuits that are approaching their physical end-of-life and will require their outright replacement within the next five to ten years. With limited available resources, power utility companies need to be able to properly prioritize their re-investments into an aging network.[1] This paper discusses, the complexities involved in the financial valuation of existing transmission line assets and in particular, summarizes the various methods that are used for determining the financial benefits or costs associated with the particular transmission line asset renewal project. The financial valuation of the transmission line asset and asset renewal projects are essential part of the process to prioritize reinvestments into the ageing transmission infrastructure.
输电线路资产财务评估与资产更新项目探讨
在北美的许多电力传输公用事业公司中,有大量的传输电路正在接近其物理寿命,需要在未来五到十年内彻底更换。由于可用资源有限,电力公司需要能够适当地优先考虑对老化网络的再投资本文讨论了现有输电线路资产财务评估的复杂性,特别是总结了用于确定与特定输电线路资产更新项目相关的财务效益或成本的各种方法。输电线路资产和资产更新项目的财务评估是优先考虑老化输电基础设施再投资过程的重要组成部分。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信