Successful Offshore Coiled-Tubing Permanent Well-Abandonment Operation Uses Downhole Real-Time Parameters to Set Inflatable Packers with Surgical Precision in Cost-Effective Manner
C. Guimaraes, E. Delgado, L. Galvão, Adriano Frotte, Manoel Gouveia, Carlos Alberto Teles Borges
{"title":"Successful Offshore Coiled-Tubing Permanent Well-Abandonment Operation Uses Downhole Real-Time Parameters to Set Inflatable Packers with Surgical Precision in Cost-Effective Manner","authors":"C. Guimaraes, E. Delgado, L. Galvão, Adriano Frotte, Manoel Gouveia, Carlos Alberto Teles Borges","doi":"10.4043/29839-ms","DOIUrl":null,"url":null,"abstract":"\n The systematic approach adopted by a service company and a Brazilian National Oil Company (NOC) to achieve the goal of safely abandoning wells with different completion types using light workover vessels is discussed. Having determined the abandonment methodology, the service company personnel developed processes and procedures to reach the objective. These include advances in coiled tubing (CT) rigup procedures and using a real-time telemetry system. This approach facilitated the timely and cost effective abandonment of more than 15 wells since 2017 in a safe and environmentally acceptable manner.","PeriodicalId":415055,"journal":{"name":"Day 1 Tue, October 29, 2019","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, October 29, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4043/29839-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The systematic approach adopted by a service company and a Brazilian National Oil Company (NOC) to achieve the goal of safely abandoning wells with different completion types using light workover vessels is discussed. Having determined the abandonment methodology, the service company personnel developed processes and procedures to reach the objective. These include advances in coiled tubing (CT) rigup procedures and using a real-time telemetry system. This approach facilitated the timely and cost effective abandonment of more than 15 wells since 2017 in a safe and environmentally acceptable manner.