{"title":"Requirement Analysis issues in Pakistan Software Industry","authors":"Huma Chaudhry, Ayesha Asmat, M. Farooq","doi":"10.21015/VTSE.V13I3.513","DOIUrl":null,"url":null,"abstract":"Requirement Analysis is an important phase in software development. Failure or success of software product depends upon requirement analysis phases. In this paper, a detailed critical analysis was conducted to find out the expected issues behind software project’s failure. It has been found that several issues are associated with this phase such as: customer ambiguity, requirement changing during the project etc. The study was conducted by questionnaires to figure out these issues in the Pakistani software industry.","PeriodicalId":173416,"journal":{"name":"VFAST Transactions on Software Engineering","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"VFAST Transactions on Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21015/VTSE.V13I3.513","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Requirement Analysis is an important phase in software development. Failure or success of software product depends upon requirement analysis phases. In this paper, a detailed critical analysis was conducted to find out the expected issues behind software project’s failure. It has been found that several issues are associated with this phase such as: customer ambiguity, requirement changing during the project etc. The study was conducted by questionnaires to figure out these issues in the Pakistani software industry.