{"title":"Innovations in live line maintenance for high voltage substations (/spl ges/63 kV) at EDF (Electricite de France)","authors":"M. Roux","doi":"10.1109/TDCLLM.1993.316249","DOIUrl":null,"url":null,"abstract":"EDF, as a goal, plans to extend live working while working on maintenance and renovation of HV substations. As a result of the analysis of the stakes and techniques adopted, the document shows the ultimate developments and the prospects of evolution at mid-term.<<ETX>>","PeriodicalId":198668,"journal":{"name":"Proceedings of ESMO '93. IEEE 6th International Conference on Transmission and Distribution Construction and Live-Line Maintenance","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ESMO '93. IEEE 6th International Conference on Transmission and Distribution Construction and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.1993.316249","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
EDF, as a goal, plans to extend live working while working on maintenance and renovation of HV substations. As a result of the analysis of the stakes and techniques adopted, the document shows the ultimate developments and the prospects of evolution at mid-term.<>