{"title":"ANALISA JARINGAN DISTRIBUSI TEGANGAN MENENGAH DENGAN SISTEM SINGLE WIRE EARTH RETURN UNTUK WILAYAH TERTINGGAL, TERDEPAN DAN TERLUAR","authors":"Rakesh Vaswani, Ridho Alpha Kusuma","doi":"10.52447/jkte.v7i1.5888","DOIUrl":null,"url":null,"abstract":"Indonesia's rural electrification rate (RER) is still low. This is due to the high cost of installing a conventional three-phase or single-phase power supply in distributed rural loads. However, the Rural Energy Agency and the National Utility have made many efforts to address this issue. To this end, this document proposes a Single Wire Earth Return (SWER) electrification scheme for the electrification of a selected village, namely Serang, Banten. Field data were collected and used to design a potential SWER distribution network. A mathematical model representing SWER for Serang, Banten was developed and simulations were performed to determine soil potential and soil resistance. These two are important every time you install a HEAVY line. In addition, a technical and economic comparison was made in order to determine the short-term costs of the proposed SWER with the existing single-phase two-wire (SPTW) system. The technical and economic analysis shows that the proposed SWER system will achieve a cost saving of 50% compared to the installation of the SPTW system for Serang Banten electrification.","PeriodicalId":239277,"journal":{"name":"Jurnal Kajian Teknik Elektro","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Kajian Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52447/jkte.v7i1.5888","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Indonesia's rural electrification rate (RER) is still low. This is due to the high cost of installing a conventional three-phase or single-phase power supply in distributed rural loads. However, the Rural Energy Agency and the National Utility have made many efforts to address this issue. To this end, this document proposes a Single Wire Earth Return (SWER) electrification scheme for the electrification of a selected village, namely Serang, Banten. Field data were collected and used to design a potential SWER distribution network. A mathematical model representing SWER for Serang, Banten was developed and simulations were performed to determine soil potential and soil resistance. These two are important every time you install a HEAVY line. In addition, a technical and economic comparison was made in order to determine the short-term costs of the proposed SWER with the existing single-phase two-wire (SPTW) system. The technical and economic analysis shows that the proposed SWER system will achieve a cost saving of 50% compared to the installation of the SPTW system for Serang Banten electrification.