{"title":"A dynamic scheduling method for product development","authors":"X. Qin, Yi-ying Cao, Xian-long Xu","doi":"10.1109/ICMIT.2008.4654395","DOIUrl":null,"url":null,"abstract":"In order to ensure the optimal scheduling and shorten the product development cycle, a method based on Activity and its Process (ProA) hierarchical decomposition integrated with product development process modeling is presented. Firstly, the hierarchical decomposition of product development based on ProA and ProA Input and Output Item (ProA InOI) are studied. Then, the relationship of ProA and ProA InOI has been discussed in detail. Thirdly, a dynamic scheduling method for product development is given and a polychromatic sets model of product development scheduling is also proposed. Finally, the feasibility of the method mentioned in the paper is demonstrated by using an application example.","PeriodicalId":332967,"journal":{"name":"2008 4th IEEE International Conference on Management of Innovation and Technology","volume":"CE-23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 4th IEEE International Conference on Management of Innovation and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMIT.2008.4654395","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In order to ensure the optimal scheduling and shorten the product development cycle, a method based on Activity and its Process (ProA) hierarchical decomposition integrated with product development process modeling is presented. Firstly, the hierarchical decomposition of product development based on ProA and ProA Input and Output Item (ProA InOI) are studied. Then, the relationship of ProA and ProA InOI has been discussed in detail. Thirdly, a dynamic scheduling method for product development is given and a polychromatic sets model of product development scheduling is also proposed. Finally, the feasibility of the method mentioned in the paper is demonstrated by using an application example.