Sirui Zhu, Xiaofan Su, Shiyao Jiang, Yuzheng Xie, Sijing He
{"title":"Analysis and Calculation Method of Simultaneity Rate of Renewable Energy Output","authors":"Sirui Zhu, Xiaofan Su, Shiyao Jiang, Yuzheng Xie, Sijing He","doi":"10.1109/IAEAC54830.2022.9930094","DOIUrl":null,"url":null,"abstract":"The increasing proportion of renewable energy participating in power systems brings new challenges to power system planning. It requires power planning to consider the uncertain impact of the high proportion of renewable energy. In this paper, a method for analyzing and calculating the simultaneity rate of renewable energy output is proposed considering the abandoned power. By analyzing the actual operation data of renewable energy, the corresponding output simultaneity rate of each data point is calculated. Then, the annual simultaneity rate of renewable energy output is calculated considering the requirement of the abandoned power rate. Finally, a provincial power grid is used to verify the effectiveness and adaptability of the proposed method, which helps improve the rationality of the power grid reinforcement scheme. The method is used in routine production and power grid planning work.","PeriodicalId":349113,"journal":{"name":"2022 IEEE 6th Advanced Information Technology, Electronic and Automation Control Conference (IAEAC )","volume":"63 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 IEEE 6th Advanced Information Technology, Electronic and Automation Control Conference (IAEAC )","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAEAC54830.2022.9930094","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
The increasing proportion of renewable energy participating in power systems brings new challenges to power system planning. It requires power planning to consider the uncertain impact of the high proportion of renewable energy. In this paper, a method for analyzing and calculating the simultaneity rate of renewable energy output is proposed considering the abandoned power. By analyzing the actual operation data of renewable energy, the corresponding output simultaneity rate of each data point is calculated. Then, the annual simultaneity rate of renewable energy output is calculated considering the requirement of the abandoned power rate. Finally, a provincial power grid is used to verify the effectiveness and adaptability of the proposed method, which helps improve the rationality of the power grid reinforcement scheme. The method is used in routine production and power grid planning work.